BG-RRP-4.032-0327-C01
Construction of a local energy storage system (LSS) with an installed capacity of 1.40 MW and a storage capacity of 2.80 MWh for a photovoltaic plant with an installed capacity of 3,72 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
18.02.2025
18.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Silistra (BG325), Silistra, Silistra
