BG-RRP-4.034-0071-C02
Project for construction of stand-alone Battery Energy Storage System (BESS) with rated power capacity of 10.35MW with direct optic connection to the telecommunication network of ESO EAD located in LP 72240.38.18 on the territory of Tenevo village, Tundzha municipality
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
26.08.2025
26.08.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Yambol (BG343), Tundzha, Tenevo
