BG-RRP-4.036-0082-C01
Construction of an independent BESS connected to the electricity transmission network of ESO EAD with a direct optical connection to the telecommunications network of ESO EAD
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
19.01.2026
19.01.2026
31.07.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-East (BG33), Shumen (BG333), Shumen, Shumen
