BG-RRP-4.032-0319-C02
Construction of a local energy storage system (LSS) with an installed capacity of 0.30 MW and a storage capacity of 0.60 MWh for a photovoltaic plant 2 (PVP 2) with an installed capacity of 0.9961 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
13.03.2025
13.03.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Pazardzhik (BG423), Septemvri, Septemvri
