BG-RRP-4.032-0242-C01
"Construction of a local battery storage power station (BESS) with an installed capacity of 0,25 MW and a storage capacity of 0,5 MWh connected to a photovoltaic power plant with an installed capacity of 0,774.56 MW."
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
19.03.2025
19.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia cap. (BG411), Sofia Cap., Yana
