BG-RRP-4.032-0230-C01
Combined project for construction of a co-located Battery Energy Storage System (BESS) with rated power capacity of 1 MW and minimal energy capacity of 2.032 MWh, together with a new built Photovoltaic power plant (PvPP) with a nominal (AC) generating capacity of 2 MW, located within LP No. 37863.390.662, easement Unknown, town of Koynare, municipality of Cherven Bryag, Pleven district
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
13.02.2025
13.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Pleven (BG314), Cherven Bryag, Koynare
