BG-RRP-4.032-0044-C02
Combined project for construction of co-located Battery Energy Storage System (BESS) with rated power capacity of 1.325 MW and minimum energy capacity of 2.752 MWh together with a new built Photovoltaic Power Plant (PvPP) for the production of electrical energy with a nominal generating capacity of 2.9757 MW situated in LP I-00165.11.117, Akandjievo village, Belovo municipality,Pazardjik district
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
09.11.2025
09.11.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Pazardzhik (BG423), Belovo, Akandzhievo