BG-RRP-13.009-0143-C01
Increasing the energy efficiency and operational sustainability of the social services provided in the territory of Simitli municipality, through the installation of a photovoltaic power plant and the delivery of an electric vehicle and charging station.
RRF ==> Recovery and Resilience Plan
000695395 Ministry of labour and social policy
08.12.2025
08.12.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Blagoevgrad (BG413), Simitli, Simitli
