| UMIS Number | BG-RRP-13.009-0143-C01 |
| Project Name | Increasing the energy efficiency and operational sustainability of the social services provided in the territory of Simitli municipality, through the installation of a photovoltaic power plant and the delivery of an electric vehicle and charging station. |
| Beneficiary | 000024987 MUNICIPALITY SIMITLI |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 08.12.2025 |
| Start Date | 08.12.2025 |
| End Date | 30.06.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящото проектно предложение предвижда изграждане в съществуващи сгради за социални услуги, делегирани от държавата фотоволтаични системи с батерии за съхранение за собствено потребление и закупуване на електрическо превозно средство със зарядна станция за целите на предоставяне на социални услуги на територията на община Симитли. Проектът предвижда изграждането на ФЕЦ с обща инсталирана мощност 15.48 kW за собствени нужди и батерии за съхранение на произведената електрическа енергия с мощност 20,48kW на покрива на Дневен център за пълнолетни лица с увреждания гр. Симитли, както и изграждането на ФЕЦ с обща инсталирана мощност 28.38 kW за собствени нужди, монтирана върху покрив на съществуваща в имота сграда в социална услуга – център за настаняване от семеен тип за пълнолетни лица с психични разстройства и батерии за съхранение на произведената електрическа енергия с мощност 30,72kW. Изпълнението на посочените мярки са насочени към социални услуги, делегирани от държавата дейност, управлявани от община Симитли. Целта на услугите е да предоставят подкрепа на уязвими групи, включително деца, възрастни хора и хора с увреждания. Чрез реализацията на проектното предложение ще се повиши енергийната ефективност и ще се намали енергийната зависимост на описаните сгради. Също така ще бъде покрита потребността на община Симитли от нарастващите мобилни нужди в социалната сфера. Чрез реализацията на описаните мерки ще се повиши енергийната ефективност и ще се намали енергийната зависимост. Също така ще бъде постигнато и значително намаление на годишното потребление на първична енергия от невъзобновяеми източници в обектите, където ще бъдат монтирани системите. Не на последно място, чрез реализацията на проекта ще бъде създадена предпоставка за намаляване зависимостта от изкопаеми горива, насърчаване на производството на възобновяема енергия и подпомагане на прехода към чиста мобилност в съответствие с Плана REPowerEU, Европейската соларна стратегия и Зеления пакт на ЕС. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Purchased electric vehicles and connected charging stations, each with a minimum power of 22 kW, Measure Unit: Number, Base Value: 0.00 , Target amount: 1.00 , Reached amount: 0.00 |
| Indicator 2 | Number of social services with installed PV power plants with a capacity of 15 to 30 kW, Measure Unit: Number, Base Value: 0.00 , Target amount: 2.00 , Reached amount: 0.00 |
| Total Project cost | 131 728.44 EUR |
| Grant | 131 728.44 EUR |
| Self amount | 0.00 EUR |
| Total actual amounts paid | 39 289.20 EUR |
| Percentage of EU co-financing | 83.33 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: „Изготвяне на инвестиционен проект във фаза Технически проект и осъществяване на авторски надзор за следните обекти:
1. „Зарядни станции за електромобили и обособяване на паркомясто за зареждане на електромобили за целите на предоставяне на социални услуги в УПИ Х, кв. 37, по плана на гр. Симитли, Община Симитли“;
2. „Монтаж на фотоволтаична инсталация за производство на електрическа енергия с обща инсталирана мощност 15.48 kW за собствени нужди;
3. „Монтаж на фотоволтаична инсталация за производство на електрическа енергия с обща инсталирана мощност 28.38 kW за собствени нужди, ,
Estimated Amount: 14 203.87
|
| Procedure 2 |
Subject to due process: Доставка и инсталиране на зарядни станции за електромобили и обособяване на паркомясто за зареждане на електромобили за целите на предоставяне на социални услуги в община Симитли в УПИ Х, кв.37, по плана на гр. Симитли, общ.Симитли,
Estimated Amount: 17 156.40
|
| Procedure 3 |
Subject to due process: Доставка на електромобил за целите на предоставяне на социални услуги в община Симитли в УПИ Х, кв.37, по плана на гр. Симитли, общ.Симитли,
Estimated Amount: 34 105.30
|
| Procedure 4 |
Subject to due process: Монтаж на фотоволтаична инсталация за производство на електрическа енергия с обща инсталирана мощност 15.48KW за собствени нужди, монтирана върху покрив на съществуваща в имота сграда в социална услуга - ДЦПЛУ и батерии за съхранение на произведената електрическа енергия с мощност 20.48KW в УПИ 157, кв.11 по плана на кв. Ораново, гр. Симитли, общ. Симитли,
Estimated Amount: 19 137.66
|
| Procedure 5 |
Subject to due process: Монтаж на фотоволтаична инсталация за производство на електрическа енергия с обща инсталирана мощност 28.38KW за собствени нужди, монтирана върху покрив на съществуваща в имота сграда в социална услуга - ЦНСТЛПР и батерии за съхранение на произведената електрическа енергия с мощност 30,72KW в УПИ V - 1153, кв.73 по плана на гр. Симитли, общ. Симитли,
Estimated Amount: 28 029.87
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN