BG-RRP-4.032-0134-C01
Delivery and installation of a local storage system with a capacity of 0.4 MW and a total capacity of stored energy of 0.928 MWh at an existing FEC with a nominal alternating current capacity of 0.91 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
06.01.2025
06.01.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Veliko Tarnovo (BG321), Gorna Oryahovitsa, Gorna Oryahovitsa
