BG-RRP-4.032-0050-C01
Installation of a battery energy storage system (BESS) with an installed power of 200 kW to an existing 450 kW Photovoltaic power plant, that was put into operation in 2023.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
08.03.2025
08.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Karlovo, Klisura
