Programme: Recovery and Resilience Plan

Planning region: All

Identification

BG-RRP-4.032-0050-C01
Installation of a battery energy storage system (BESS) with an installed power of 200 kW to an existing 450 kW Photovoltaic power plant, that was put into operation in 2023.
176789460 MINISTRY OF ENERGY
08.03.2025
08.03.2025
31.03.2026
In execution (starting date)
Location of Performance
  • Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Karlovo, Klisura

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]