BG-RRP-4.033-0011-C01
Construction of new power generation capacities from renewable sources with an installed nominal alternating current power (AC power) of 150MW and electricity storage with an installed power of 70 MW and a useful capacity of 140 MWh
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
05.03.2025
05.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Stara Zagora (BG344), Galabovo, Galabovo
