BG-RRP-4.032-0225-C01
Delivery and installation of a 400 KW Battery Energy Storage System (SES) to an 800 KW Photovoltaic Power Plant
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
10.11.2025
10.11.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Pazardzhik (BG423), Pazardzhik, Aleko Konstantinovo
