BG-RRP-4.032-0130-C01
Renewable electricity generation and electricity storage with an installed capacity of 1,9734 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
11.02.2025
11.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Kotel, Kotel
