BG-RRP-4.032-0210-C01
Construction of a Local Electrical Energy Storage System (LEESS) with a power of 2MW to a Photovoltaic Power Plant (PvPP) with a power of 6MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
15.01.2025
15.01.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Haskovo (BG422), Ivaylovgrad, Ivaylovgrad
