BG-RRP-4.032-0073-C01
Construction of a local electrical energy storage system (LSS) with a capacity of 472 kW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
13.02.2025
13.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Sliven, Sliven
