BG-RRP-4.032-0290-C02
Construction of a Local Energy Storage System with a Capacity of 1.976 MWh on a Planned PV Plant in Tutrakan
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
06.03.2025
06.03.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Silistra (BG325), Tutrakan, Tutrakan
