Identification

UMIS Number BG-RRP-4.032-0290-C02
Project Name Construction of a Local Energy Storage System with a Capacity of 1.976 MWh on a Planned PV Plant in Tutrakan
Beneficiary 202180780 LIBRA BULGARIA OOD
Funding RRF ==> Recovery and Resilience Plan
Date of the Contract/Order 06.03.2025
Start Date 06.03.2025
End Date 30.06.2026
Status of Implementation of the Contract/Order of the Grant In execution (starting date)
Location of Performance
  • България, Северна и югоизточна България (BG3), Северен централен (BG32), Силистра (BG325), Тутракан, гр.Тутракан

Description

Brief description
Проектът предвижда изграждане на локална система за съхранение на енергия (ЛСС) с капацитет 1.976 MWh, която ще бъде интегрирана с планираната фотоволтаична електроцентрала (ФЕЦ) с номинална мощност 2.310 MW. ЛСС ще осигури съхранение на произведената електроенергия и ще подобри ефективността и надеждността на ФЕЦ.
Activities
  • Activity: Проектиране и планиране на локалната система за съхранение на енергия (ЛСС) : Тази дейност включва детайлно проектиране и планиране на ЛСС, която ще бъде интегрирана със съществуващата фотоволтаична електроцентрала (ФЕЦ). Включва се извършване на предпроектни проучвания, избор на подходящо оборудване и технологии, и разработване на техническа документация. Всички активи ще бъдат нови и съответстващи на стандартите за качество и безопасност. Основната цел е да се осигури оптимален проект, който да отговаря на всички изисквания за ефективност и надеждност., Contracted Amount: 9 203.24 , Reported Amount: 0.00
  • Activity: Доставка и монтаж на оборудване за ЛСС : В тази дейност се включва закупуване, доставка и монтаж на всички необходими компоненти за ЛСС, включително батерии, инвертори, контролни системи и други съоръжения. Оборудването трябва да отговаря на най-високите стандарти за качество и ефективност. Доставките и монтажът ще бъдат съгласувани с графика на строително-монтажните работи, за да се осигури безпроблемно изпълнение на проекта., Contracted Amount: 604 265.19 , Reported Amount: 0.00
  • Activity: Изграждане на съоръженията за свързване на ЛСС към съоръженията по комбинирания проект : Изграждане на необходимите съоръжения и инфраструктура за свързване на ЛСС към съоръженията по комбинирания проект (ФЕЦ). Включва настройка на системите за мониторинг и управление на енергията, тестове и пускане в експлоатация. , Contracted Amount: 33 131.72 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors None
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.86 , Reached amount: 0.00
Indicator 2 Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 1.98 , Reached amount: 0.00
Indicator 3 Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 2.31 , Reached amount: 0.00

Financial Information

Total Project cost 646 600.15 EUR
Grant 323 300.07 EUR
Self amount 323 300.08 EUR
Total actual amounts paid 0.00 EUR
Percentage of EU co-financing 100.00 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

Procedure 1 Subject to due process: Доставка и монтаж на оборудване за ЛСС, Estimated Amount: 604 265.20
Procedure 2 Subject to due process: Изграждане на съоръженията за свързване на ЛСС, Estimated Amount: 33 131.71
Procedure 3 Subject to due process: Проектиране и планиране на ЛСС - Проектиране и планиране на локалната система за съхранение на енергия (ЛСС), Estimated Amount: 9 203.25

Notes:

All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN