BG-RRP-4.034-0128-C02
Construction and commissioning of facilities for storing electricity from renewable sources with 80MW power and a capacity of 350MWh at the level of the electricity grid by "Arsenal 2000" AD
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
29.08.2025
29.08.2025
01.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Stara Zagora (BG344), Kazanlak, Sheynovo
