Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 256 TREES
Български

Programme: Recovery and Resilience Plan

Planning region: All

Identification

BG-RRP-4.033-0001-C02
Construction of local energy storage facilities (LSS) with a capacity of 12MW to a photovoltaic installation /PVI/ for own consumption of the produced electricity up to 30000kWp (installed DC power 27836.16kWp and AC power 24200kW).
176789460 MINISTRY OF ENERGY
13.11.2025
13.11.2025
30.06.2026
In execution (starting date)
Location of Performance
  • Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Stara Zagora (BG344), Kazanlak, Kazanlak

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.