BG-RRP-4.033-0001-C02
Construction of local energy storage facilities (LSS) with a capacity of 12MW to a photovoltaic installation /PVI/ for own consumption of the produced electricity up to 30000kWp (installed DC power 27836.16kWp and AC power 24200kW).
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
13.11.2025
13.11.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Stara Zagora (BG344), Kazanlak, Kazanlak
