BG-RRP-4.032-0198-C01
"Construction of a local battery storage power station (BESS) with an installed capacity of 1.5 MW and a storage capacity of 3.44 MWh connected to a photovoltaic power plant with an installed capacity of 4.8 MW."
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
24.03.2025
24.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Ruse (BG323), Slivo Pole, Ryahovo
