BG-RRP-4.033-0056-C02
Combined project for construction of a co-located Battery Energy Storage System (BESS) with rated power capacity of 25MW and minimum energy capacity of 50MWh together with a new built Photovoltaic Power Plant (PvPP) for the production of electrical energy with a nominal AC generating capacity of 50MW located on land plots in the town of Sliven, Sliven municipality.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
07.03.2025
07.03.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Sliven, Sliven