BG-RRP-4.032-0165-C01
Construction of a new installation combining a photovoltaic power plant (PEC) with a nominal alternating current power of 0.99 MW and a local storage facility (LSS) of electric energy with an installed capacity of 0.45 MW and a useful capacity of 1.35 MWh
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
16.01.2025
16.01.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Kardzhali (BG425), Kirkovo, Dedets
