| UMIS Number | BG-RRP-4.032-0165-C01 |
| Project Name | Construction of a new installation combining a photovoltaic power plant (PEC) with a nominal alternating current power of 0.99 MW and a local storage facility (LSS) of electric energy with an installed capacity of 0.45 MW and a useful capacity of 1.35 MWh |
| Beneficiary | 205752966 DOMINUS FASHION |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 16.01.2025 |
| Start Date | 16.01.2025 |
| End Date | 31.03.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Настоящото проектно предложение е за получаване на безвъзмездна помощ за разходите за доставка и монтаж на локални съоръжения за съхранение на електрическа енергия (ЛСС) с инсталирана мощност 0.45 МW и полезен капацитет 1.35 МWh към фотоволтаична система с номинална променливотокова АС мощност 0.99 МW. За изграждането на мрежовата ФЕЦ, част от комбинирания проект, има издадено и влязло в сила разрешение за ползване от 23.05.2024 г. На 04.09.2023 г. е подписан договор за присъединяване на обект за производство на електрическа енергия към електроразпределителната мрежа на "Електроразпределение ЮГ" ЕАД. За монтажа на ЛСС има изготвен технически проект за обект по чл.56 от ЗУТ - Преместваеми обекти и елементи на градското обзавеждане. Към настоящия момент не е стартирало монтирането на ЛСС. Комбинираният проект ще се изпълни в с. Дедец, Община Кирково, Област Кърджали, ПИ с идентификатор 20496.1.26 Дейностите по монтиране на ЛСС ще се извърши от лица, притежаващи необходимия опит за извършването на тази дейност. |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.45 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 1.35 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.99 , Reached amount: 0.00 |
| Total Project cost | 282 233.12 EUR |
| Grant | 141 116.56 EUR |
| Self amount | 141 116.56 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Доставка и монтаж на ЛСС ,
Estimated Amount: 552 000.00
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN