BG-RRP-4.036-0054-C01
Construction and Commissioning of an Energy Storage Facility with an Installed Capacity of 10 MW and a Storage Capacity of 50.1 MWh by "Polski Trambesh Balancing System" Ltd.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
19.01.2026
19.01.2026
31.07.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Veliko Tarnovo (BG321), Polski Trambesh, Polski Trambesh
