BG-RRP-4.032-0034-C02
Installation of a local electrical energy storage facility with a capacity of 500 kW - 1075 kWh to a PV power plant with a capacity of 1000 kW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
10.11.2025
10.11.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia (BG412), Dolna Banya, Dolna Banya
