BG-RRP-4.021-0076-C01
Increasing the energy efficiency of the building stock of BANKY PALACE OOD
RRF ==> Recovery and Resilience Plan
831661388 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS
01.08.2024
01.08.2024
30.06.2026
Terminated (termination date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia cap. (BG411), Sofia Cap., Bankya
