BG-RRP-4.032-0020-C02
Renewable electricity generation and electricity storage with an installed capacity of 4,8 MW
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
19.03.2025
19.03.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Kotel, Kotel
