BG-RRP-4.034-0075-C01
Project for construction of stand-alone Battery Energy Storage System (BESS) with rated power capacity of 10.35MW with direct optic connection to the telecommunication network of ESO EAD located on LP 59080.42.529 on the territory of Parvomay city
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
28.08.2025
28.08.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Parvomay, Parvomay
