BG-RRP-4.032-0277-C02
"Construction of a local energy storage system (ESS) with an installed capacity of 0,2 MW and a storage capacity of 0,466 MWh connected to a photovoltaic power plant with an installed capacity of 0,49 MW."
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
14.03.2025
14.03.2025
30.06.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia (BG412), Slivnitsa, Slivnitsa
