The building subject of the project is located in the town of Oryahovo, 23 "Kosta Lulchev" street. It was built in 1930 as a school and is still used for its intended purpose. The building has 3 floors with monolithic construction, consists of two buildings. The roof is pitched, with a wooden structure, without thermal insulation. Heating is provided by a local coal-fired steam plant. Access to the building is through two entrances. The project proposal envisages carrying out a package of measures to achieve energy efficiency in the building of SU "Hristo Botev", Oryahovo: thermal insulation of walls, roof and floor; replacement of windows and doors; installation of an air-to-air heat pump system; replacement of all lighting fixtures with LED; installation of a photovoltaic system; improving the access of persons with disabilities to and inside the relevant building. More than 307 students, a large part of them from minority groups, are educated daily at SU "Hristo Botev".
Activities
Activity
Contracted Amount
Reported Amount
Дейност 1: Обновяване на инфраструктурата и мерки за повишаване на енергийната ефективност,ремонт и доставка на оборудване и обзавеждане на сградата на СУ "Христо Ботев" -гр.Оряхово: Изпълнение на пакет от мерки за енергийна ефективност на учебната сграда- топлоизолиране на стени,покрив и под. Подмяна на прозорци и врати.Монтиране на термопомпена система тип "въздух-въздух". Подмяна на всички осветителни тела с LED. Монтаж на фотоволтаична система.Подобряване на достъпа на лицата с увреждания до и вътре в съответната сграда
4 458 163.22
105 128.64
Notes:
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN