Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 256 TREES
Български

Programme: Recovery and Resilience Plan

Planning region: All

Description

Object of the project investment is a Telescopic loader 100 hp. with air conditioning, capacity at maximum height 2000 kg, lifting height 6 675 mm, joystick, bucket, fork, telematic system for remote start, STAGE V engine.
The telematics system enables control of fuel consumption, operating time, machine location. It will help improve productivity and reduce machine costs and monitor work functions.
The telescopic loader with a telematic system for remote access will automate the processes of raising animals and will replace a lot of manual labor, which will increase the efficiency of the operation and the competitiveness of the farm.
The loader will clean the farm every few days. Loading and unloading of coiled bales for feeding the animals will be carried out.
The goals of the project are technological modernization within the farm, automation of animal cleaning and feeding processes, elimination of manual labor and improvement of animal health and productivity.
Activities
Activity Contracted Amount Reported Amount
Технологична и екологична модернизация на отделните фази на производствените процеси за животновъдството ( ПО: BG-RRP-6 , фонд: МВУ: Закупуване на Телескопичен товарач 100к.с. с климатик, капацитет при максимална височина 2000кг., Височина на повдигане 6 675мм., джойстик,кофа, вилица, телематична система за дистанционен дотъп, двигател STAGE V. 80 500.00 80 500.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.