This investment shall include the installation of interoperable track-side ETCS equipment on 108 electric locomotives and electric multiple-units, a significant increase vs the current 2 locomotives equipped with such technology. It entails the following steps:
• develop a funding allocation mechanism that takes into account information of the eligible railway undertakings, including the number of train-kilometres in the last 5 years, a 10-year business plan for the running of the equipped units and information regarding the provision of own funding (since beneficiaries are expected to fund 50% of the total cost);
• based on the results of the previous point, a procedure under the Public Procurement Act will be announced for the delivery, installation, commissioning, testing and obtaining of permits and training by the Ministry of Transport. The winning participant will deliver the ETCS equipment and carry out the installation in the selected rolling stock.
Activities
Activity Contracted Amount Reported Amount
Доставка и инсталиране на 108 броя бордово оборудване за ERTMS/ETCS: Доставка и инсталиране на 108 броя бордово оборудване за ERTMS/ETCS 64 422 777.03 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.