Programme: Recovery and Resilience Plan

Planning region: All

Description

Brief description of the project proposal	
The project envisages the implementation of energy-saving measures and recommendations for energy saving.

The measures provide for the decommissioning of energy-intensive equipment /Vertical machining center "RV 501.24
HEBROS" and Machine for longitudinal milling 6M610F11/ and delivery and installation of a new machining center / HAAS VF12/50
/ with high energy CNC control.

Measures for the introduction of waste heat recovery systems. Establishment of a system for the recovery of waste heat from compressor units by means of its capture and use for tempering varnish coating paints.

The project envisages the introduction of a system for monitoring the electricity consumption. This will help to continuously register and store electricity consumption data. The analysis of the information received from the monitoring system of the electricity consumption will help to make the right technological and management decisions that would lead to saving electricity.
Activities
Activity Contracted Amount Reported Amount
Управление на проекта: Описание Управление на проекта и съгласуване дейността на партньорите помежду им и с финансиращата организация. Целта е пълна координация на проекта при планиране и проверка на изпълнението на отделните задачи. Координацията на проекта от административна и техническа гледна точка включва: връзка с УО за осъществяване на адекватно докладване, проверка и отчитане на изпълнението на отделните етапи и на целия проект; финансово управление на проекта; осъществяване на добра комуникация между партньорите в проекта; управление на риска на изследването и актуализиране на отделните планове за изпълнение на дейностите. Описание на задачите: Зад.1:Начало. Обсъждане на задачите и съвместната работа между партньорите. Организиране на първа работна среща между партньорите. Зад.1.1:Съгласуване на административно-управляващите процедури. Зад.1.2:Определяне на специалистите в управляващия комитет на консорциума(партньорите),отговорни за изпълнението на всички задачи на проекта. Зад.1.3:Определяне на задачите на всеки партньор. Определяне на изпълнителите на всяка задача. Проверка на изпълнението на всяка задача. Зад.1.4:Определяне на процедурите за вземане на решения, за комуникация, за отчитане на получените резултати. Зад.2:Планиране на проектните задачи. Подготвяне на подробен работен план за задачите на всеки партньор и резултатите, които трябва да се получат. Работният план трябва да съдържа организационната структура, индивидуалните за дачии отговорността на отделните членове на колектива. Зад.3:Осигуряване на текущ контрол на изпълнение на задачите по проекта. Провеждане на текущконтрол на изпълнението на проекта и координиране на този контрол с между партньорите. Така щесе осигури изпълнение на задачите качествено и в срок. Зад.4:Администриране и управление на финансовите разходи. Текущо следене на разпределението на финансовите средства и тяхното изразходване за изпълнението на задачите на проекта. / Description Project management and coordination of the activities of the partners with each other and with the financing organization. The aim is full coordination of the project in planning and checking the performance of the individual tasks. Coordination of the project from an administrative and technical point of view includes: carrying out adequate reporting to the Managing Authority , verification and reporting of the implementation of the individual stages and the whole project; financial management of the project; good communication between the project partners; management of the study and updating the individual action plans. Description of the tasks: Task.1: Discuss tasks and collaborate between partners. Organization of the first workshop between the partners. Task .1.1:Coordination of administrative-management procedures. Task.1.2:Designation of specialists in the Management Committee of the consortium(s) responsible for carrying out all the tasks of the project. Task.1.3:Defining each partner's tasks. Determine the contractors of each task. Check the performance of each task. Task.1.4:Defining decision-making procedures, communication, reporting results. Task.2:Planning project tasks. Prepare a detailed work plan for each partner's tasks and the results to be obtained. The work plan must contain the organisational structure, the individual responsibility of the individual members of the collective. Task.3: Ensuring ongoing control of the performance of the project tasks. Conduct of the ongoing monitoring of the implementation of the project and coordination of this control with between the partners. This will ensure the performance of the tasks qualitatively and timely. Task.4: Administration and management of financial costs. Ongoing monitoring of the allocation of funds and their spending on the implementation of the project tasks. 14 500.00 0.00
Доставка и монтаж на машини, съоръжения и оборудване, представляващи дълготрайни материални активи, препоръчани в обследването за енергийна ефективност: Вертикален Обработващ Център със следните минимални параметри: - Вертикален Обработващ Център, 150" x 32" x 30" (3810 x 813 x 762 mm); - Ходове - X бърз ход, 600 ipm (15.2 m/min) Y amp; Z бърз ход, автоматичен; - Стужкотранспортьор тип шнек; - Дистанционно управление с цветен дисплей,15 инча цветен LCD дисплей; - USB port,заключване на паметта; - Ethernet интерфейс. / Description Vertical Machining Center with the following minimum parameters: - Vertical Machining Center, 150" x 32" x 30" (3810 x 813 x 762 mm); - Strokes - X rapid traverse, 600 ipm (15.2 m/min) Y amp; Z rapid traverse, automatic - Screw conveyor belt - Remote control with color display,15 inch color LCD display; - USB port, memory lock; - Ethernet interface. 285 600.00 0.00
Изпълнение на енергоспестяващи мерки за повторно използване в индустриалните процеси на отпадна топлина, препоръчани в обследването за енергийна ефективност / Implementation of energy saving measures for reuse in industrial processes of waste heat recommended in the energy efficiency survey: Изграждане на система за оползотворяване на отпадна топлина от компресорните агрегати в Компресорна станция 1, включваща: ­- Правоъгълни и фасонни въздуховоди от поцинкована ламарина: 800 x 800mm; ­- Регулираща клапа за спиране и пропускане на въздушния поток: 800 x 800mm; ­- Вентилационна решетка: 800 x 800mm с мрежа 10 х 10mm. / Construction of a system for the recovery of waste heat from compressor units in Compressor Station 1, including: - Rectangular and phased ducts of galvanized sheet metal: 800 x 800mm; - Air flow stop and leak control valve: 800 x 800mm; - Ventilation grille: 800 x 800mm with mesh 10 x 10mm. 1 980.00 0.00
Въвеждане на система за мониторинг на потребната електрическа енергия, препоръчана в обследването за енергийна ефективност / Implementation of a system for monitoring the required electrical energy recommended in the energy efficiency survey: Описание на системата за мониторинг на консумацията на електрическа енергия: Проекта предвижда въвеждане в експлоатация на система за оптимизация на консумацията и мониторинг на потребяваната електрическа енергия в производствените звена на ТРАНСВАГОН АД в процеса на механична обработка на детайли Предложено е комплексно решение, изградено върху специализиран хардуер и специализирани софтуерни компоненти, което: •Осигурява средства за наблюдение и управление на енергийната консумация в реално време чрез дистанционна свързаност към електро-механичното индустриално оборудване •Решението е реализирано чрез пренос на данни за консумацията на електрическа енергия в реално време чрез налични индустриални датчици и контролери (PLC) към Cloud базирани платформи за управление на IoT инфраструктура (dataFruit софтуер § хардуер) Решението се позиционира като гъвкава индустриална платформа, способна бързо да осигурява функционалност за последващо внедряване на комплексни IoT решения. Системата за мониторинг осигурява следната основна функционалност: •Дистанционна инфраструктурна свързаност на електро-механично и индустриално оборудване към централизирано IoT наблюдение и управление на консумацията на електрическа енергия •Двустранна комуникация с управляващи контролери (PLC) и индустриални датчици, посредством стандартизирани индустриални протоколи •Първична обработка на постъпващите данни от индустриални датчици •Нормализация и валидация на постъпващите данни •Трансфер на данните в комплексната среда на съществуващи Cloud базирани IoT платформи за разработка на софтуерни приложения с различно предназначение за мониторинг Област на приложение и предназначение: •Мониторинг на консумацията на електрическа енергия в производствени звена с електро-механично индустриално оборудване •Натрупване на исторически данни за консумацията на електрическа енергия в производствени звена •Анализ и оптимизация на функционирането на индустриалното оборудване на база натрупаните исторически данни за консумацията на електрическа енергия в производствени звена. / Description of the electricity consumption monitoring system: The project envisages commissioning a system for optimization of consumption and monitoring of electricity consumption in the production units of TRANSVAGON AD in the process of mechanical processing of details A complex solution built on specialized hardware and specialized software components is proposed, which: •Provides means for monitoring and managing real-time energy consumption through remote connectivity to electro-mechanical industrial equipment, •The solution is implemented by transporting real-time electricity consumption data through available industrial sensors and controllers (PLC) to Cloud-based IoT infrastructure management platforms (dataFruit software § hardware) The solution is positioned as a flexible industrial platform capable of quickly providing functionality for the subsequent deployment of complex IoT solutions. The monitoring system provides the following basic functionality: •Remote infrastructure connectivity of electrical and mechanical and industrial equipment to centralized IoT monitoring and management of electricity consumption •Two-way communication with control controllers (PLC) and industrial sensors using standardized industrial protocols •Primary processing of incoming data from industrial sensors •Normalization and validation of incoming data Transfer data in the complex environment of existing Cloud-based IoT platforms for development of software applications with different monitoring purposes Area of application and purpose: •Monitoring of electricity consumption in production units with electrical and mechanical industrial equipment •Accumulation of historical data on electricity consumption in production units •Analysis and optimization of the functioning of industrial equipment based on accumulated historical data on electricity consumption in production units. 53 400.00 0.00
Обмяна на опит, знания и най-добри практики за оптимизиране на потреблението на енергия за подобрена производителност с използване на Tecnomatix Plant Simulation / Exchange of experience, knowledge and best practices to optimize energy consumption for under-the-top performance using Tecnomatix Plant Simulation: Описание Симулация на текущата консумация на ел. енергия и оценка на енергийната ефективност в производствената инфраструктура на Трансвагон АД с помощта на Siemens Tecnomatix PlantSimulation. Оптимизация на енергийната консумация в производството на Трансвагон АД за сметка подмяна на машини с по-ниска консумация на електрическа енергия, оценка на ефективността на текущата консумация на електроенергия и въвеждане на система за наблюдение и анализ на енергийната ефективност. Задачи • Решението включва изпълнение на задачи за симулация, анализ и оптимизация на моделите на консумация на енергия в индустриалните процеси за механична обработка в производството на талиги за вагони в Трансвагон АД . • Задачата се изпълнява с използване на Siemens Tecnomatix Plant Simulation и позволява реалистична симулация и оптимизация на енергийната консумация в индустриална среда, на база оценка на четири работни състояния във времето на всеки консуматор на енергия в производствения цех. • Интегрираните в Siemens Tecnomatix Plant Simulation средства за визуализация дават нагледна визуална интерпретация на консумацията на електроенергия в цеха, вкл. нейното разпределение по машини часови зони. • Siemens Tecnomatix Plant Simulation позволява оптимизиране на използването на енергия на съществуващите в Трансвагон АД производствени системи като предписва мерки, които са предписани и проверени в стимулационна среда преди тяхното изпълнение. / Description Simulation of current power consumption energy efficiency assessment in the production infrastructure of Transvagon AD with the help of Siemens Tecnomatix simulation of plants. Optimization of energy consumption in the production of Transvagon AD at the expense of replacement of machines with lower electricity consumption, evaluation of the efficiency of current electricity consumption and the introduction of an energy efficiency monitoring and analysis system. Tasks • The solution includes the execution of tasks for simulation, analysis and optimization of energy consumption models in the industrial processes for mechanical processing in the production of wagon bogies in Transvagon AD. • The task is performed using Siemens Tecnomatix Plant Simulation and allows realistic simulation and optimization of energy consumption in an industrial environment, based on an assessment of four working states over time of each energy consumer in the production workshop. • Siemens Tecnomatix Plant-integrated Visualization Simulation Tools gives an insight into the visual interpretation of the electricity consumption in the workshop, including its distribution by machine time zones. • Siemens Tecnomatix Plant Simulation allows optimization of the energy use of existing in Transvagon AD production systems by prescribing measures that are prescribed and checked in a stimulation environment before their implementation. 19 558.30 0.00
Дейност за информираност и публичност / Awareness and publicity activity: Дейността обхваща процеса на организация и провеждане на дейностите по информация и публичност, свързани с реализацията на проекта, представянето на същността му и постигането на заложените цели и резултати. Планът за публичност на проектното предложение включва следното: - целите и целевите групи, включително заинтересовани лица на национално, регионално и местно ниво и обществото в България и Норвегия; - стратегия и мерки за информиране и публичност, включително и обобщен времеви график на изпълнението им; - най-малко две информационни дейности, както и начални и заключителни медийни събития с информация за възможностите, които Норвежкият финансов механизъм на ЕИП предлага, подкрепата от финансовия механизъм на ЕИП, напредъка, резултатите и постиженията на проекта. - мерки за разпространяване на информация за проекта и неговото финансиране в интернет чрез разработване на уеб страница; - информация за контакт с отговорника в екипа за изпълнение на проекта относно изпълнението на мерките за информация и публичност; - разработване на интернет страница и регулярно попълване на информация за проекта / Description The activity covers the process of organization and conduct of information and publicity related to the implementation of the project, the presentation of its essence and the achievement of the objectives and results set. The publicity plan for the project proposal shall include the following: - targets and target groups, including stakeholders at national, regional and local level and society in Bulgaria and Norway; - strategy and information and publicity measures, including a summary timeline of their implementation; - at least two information activities, as well as initial and final media events with information on the possibilities that the Norwegian Financial mechanism proposes support from the EEA Financial Mechanism, the progress, results and achievements of the project. - measures to disseminate information about the project and its financing on the internet by developing a web page; - contact information with the project implementation team on the implementation of information and publicity measures; - development of a website and regular completion of project information 9 500.00 0.00
Одит на проекта / Audit of the project: Проверка от независим финансов одитор на финансовия отчет по проекта . Основна цел на одита е получаване на одиторски доказателства и да се гарантира с висока степен на сигурност, че: - има съответствие между водената отчетност и изискванията на законодателството и финансиращата страна; - изпълнени са необходимите процедури за финансова дисциплина; - разходите и приходите, посочени във финансовия отчет, са документално обосновани и фактически извършени/получени; - разходите и приходите, посочени във финансовия отчет, са относими към бюджетните пера; - не е налице двойно финансиране. / Verification by an independent financial auditor of the project financial statement. The main purpose of the audit is to obtain audit evidence and to ensure with a high degree of certainty that: - - there is compliance between the reporting and the requirements of the legislation and the financing party; - the necessary procedures for financial discipline have been completed; - the expenditure and revenue specified in the financial statements are documentary justified and factually completed/received; - the expenditure and revenue referred to in the financial statements shall be relevant to the budget headings; - there is no double funding. 4 000.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).