Second phase on project "Rehabilitation of the water supply and sewerage system in town of Bansko with construction of a WWTP |
BG16M1OP002-1.005-0003-C01 |
0.00
|
0.00
|
Face To Face services in CESA (Center for employment and social assistance) |
BG05M9OP001-3.002-0001-C05 |
0.00
|
0.00
|
Green and accessible urban environment for the residents of Stara Zagora - phase ІІ |
BG16RFOP001-1.006-0001-C02 |
7 052 352.43
|
6 727 425.73
|
Reconstruction of the central pedestrian zone |
BG16RFOP001-1.010-0002-C02 |
10 417 646.53
|
11 245 275.01
|
Construction, complete renovation / reconstruction of 26 schools and kindergartens on the territory of Sofia Municipality |
BG16RFOP001-1.001-0001-C05 |
2 283 493.61
|
2 286 166.12
|
Rehabilitation and new spatial solutions in the pedestrian zone of the town's central area and rehabilitation of the "Todor Kirkov" Square, Varosha quarter, town of Lovech |
BG16RFOP001-1.020-0001-C02 |
1 195 737.52
|
1 178 702.74
|
Strengthening of landslide SLV 20.07613-09 on the territory of village 'Kachulka' (former village 'Kachulka'), Sliven Municipality |
BG16M1OP002-4.003-0012-C01 |
339 239.59
|
438 296.35
|
Restoration and conservation of habitats and species in Central Balkan National Park |
BG16M1OP002-3.007-0006-C07 |
0.00
|
0.00
|
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage 1 |
BG16M1OP001-1.001-0003-C05 |
13 210 113.99
|
16 144 635.67
|
Modernization of the Sofia - Plovdiv railway line: railway section Elin Pelin - Kostenets |
BG16M1OP001-1.001-0004-C03 |
0.00
|
0.00
|
Construction of a covered boat shelter in the aquatory to the west of the Fishing port area (former Chengene skele area), Burgas Municipality |
BG14MFOP001-1.009-0004-C06 |
0.00
|
0.00
|
Green spaces development and physical environment improvement of the Station Garden in Stara Zagora |
BG16RFOP001-1.006-0005-C01 |
4 000 000.00
|
4 374 854.14
|
Reconstruction of Stara Zagora and Nova Zagora Railway Station Complexes - Phase 1 |
BG16M1OP001-3.001-0009-C05 |
3 375 270.34
|
2 704 205.04
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-10065-C01 |
0.00
|
2 407.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-17036-C01 |
0.00
|
1 906.92
|
Sofia Integrated Urban Transport - II stage |
BG16RFOP001-1.041-0001-C07 |
47 747 139.77
|
38 599 925.16
|
Prevention and counteraction of landslide processes on the Republican road network - Phase 2 |
BG16M1OP002-4.003-0010-C05 |
0.00
|
0.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-6956-C01 |
0.00
|
2 587.05
|
Construction of water supply and sewerage infrastructure on the designated territory serviced by Water Supply and Sewerage Ltd. - Vratsa |
BG16M1OP002-1.016-0002-C03 |
354 006.45
|
442 554.00
|
Construction of water supply and sewerage infrastructure on the designated territory serviced by Water Supply and Sewerage Ltd., Vidin |
BG16M1OP002-1.016-0006-C06 |
5 258 696.85
|
0.00
|
Restoration of damage to forests of the municipality It has been haunted by forest fires, natural disasters and catastrophic events |
BG06RDNP001-8.004-0037-C05 |
621 873.04
|
715 144.78
|
Lot 34 „Road III-559 Polski gradezt – Topolovgrad - Ustrem from km 4+500 to km 23+520 and from km 35+060 to km 39+450, with a total length of 23,41 km, region of Haskovo” |
BG16RFOP001-7.001-0034-C05 |
0.00
|
0.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-3922-C01 |
0.00
|
0.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-3922-C01 |
0.00
|
4 594.21
|
Modernization of Sofia – Dragoman – Serbian border Railway line: section Voluyak – Dragoman phase 1
|
BG16M1OP001-1.001-0006-C01 |
0.00
|
0.00
|
From East2West - 2. Access to OEM Corridor through the Core Port of Burgas: Rehabilitation of the rail connections towards the Trans-European Transport Network. |
BG16M1OP001-1.001-0005-C03 |
6 537 096.44
|
7 247 038.85
|
Integrated Water Project for the District of Burgas |
BG16M1OP002-1.016-0011-C07 |
3 149 593.76
|
504 808.80
|
Recovering SMEs by improving energy efficiency |
BG16RFOP002-6.002-0923-C01 |
149 749.50
|
299 499.00
|
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage II |
BG16FFPR001-1.001-0001-C01 |
9 042 618.89
|
0.00
|