Different and together, we play, learn and create |
BG05M2OP001-3.001-0053-C02 |
0.00
|
28 275.54
|
Investigation and implementation of energy efficiency measures (overhaul and introduction to energy saving measures) of Kindergartens № 8 “Izvorche” and №1 “Minyorche” |
BG16RFOP001-1.018-0001-C03 |
861 013.56
|
869 949.21
|
Services for early childhood development in the municipality of Pernik |
BG05M9OP001-2.004-0040-C08 |
12 900.00
|
0.00
|
Investigation and implementation of energy efficiency measures (overhaul and introduction to energy saving measures) of Kindergartens № 8 “Izvorche” and №1 “Minyorche” |
BG16RFOP001-1.018-0001-C03 |
0.00
|
0.00
|
Investigation and implementation of energy efficiency measures (overhaul and introduction to energy saving measures) of Kindergartens № 8 “Izvorche” and №1 “Minyorche” |
BG16RFOP001-1.018-0001-C03 |
0.00
|
0.00
|
Daily Center for Adults with Disabilities "Kindness" in Sevlievo |
BG05M9OP001-2.005-0075-C02 |
27 961.56
|
27 961.56
|
Implementation of energy efficiency measures in the administrative building located in Velingrad, 16 "Han Asparuh" Str. |
BG16RFOP001-1.037-0002-C01 |
847 080.00
|
915 007.89
|
Renovation and energy efficiency of educational infrastructure in Smolyan |
BG16RFOP001-1.022-0002-C01 |
536 182.57
|
427 953.42
|
Investments in improving the quality of the educational environment at Blagoevgrad Professional High School |
BG16RFOP001-3.002-0030-C02 |
15 163.20
|
15 163.20
|
Renovation of multifamily buildings in the municipality of Blagoevgrad |
BG16RFOP001-1.008-0007-C02 |
319 440.00
|
322 634.40
|
Increasing the energy efficiency of residential buildings in the town of Razlog - Third group. |
BG16RFOP001-2.001-0118-C03 |
0.00
|
0.00
|
Construction of Social Housing in the fourth microregion |
BG16RFOP001-1.008-0002-C03 |
1 694 605.68
|
1 694 605.68
|
Increasing the energy efficiency of residential buildings in the town of Razlog - Second group |
BG16RFOP001-2.001-0117-C04 |
0.00
|
0.00
|
Providing quality, safe and productive workplaces in "Orbel 2001 'AD |
BG05M9OP001-1.008-1403-C01 |
80 677.29
|
80 677.29
|
Design and construction of the composting plant and a plant for pre-treatment of waste for the needs of the municipalities of the RAWM Dospat |
BG16M1OP002-2.002-0001-C02 |
0.00
|
0.00
|
Reconstruction of Stara Zagora and Nova Zagora Railway Station Complexes - Phase 1 |
BG16M1OP001-3.001-0009-C05 |
0.00
|
0.00
|
STIMUL for early childhood development |
BG05M9OP001-2.004-0058-C07 |
4 200.00
|
3 443.92
|
Renovation of the educational infrastructure in Gotse Delchev town |
BG16RFOP001-1.028-0002-C01 |
26 491.20
|
15 242.73
|
Construction of social housing in the neighborhood "Teva" - Municipal building with capacity for 100 people |
BG16RFOP001-1.018-0003-C02 |
1 458 228.18
|
1 458 228.18
|
Construction of an installation for the composting of separately collected green waste - Vratsa region |
BG16M1OP002-2.005-0020-C03 |
3 391.12
|
3 663.76
|
Providing infrastructure for 9 new social services for adults and people with disabilities in Sofia Municipality located in 2 sites |
BG16RFOP001-5.002-0007-C01 |
73 137.60
|
0.00
|
Construction, complete renovation / reconstruction of 26 schools and kindergartens on the territory of Sofia Municipality |
BG16RFOP001-1.001-0001-C05 |
103 998.00
|
103 998.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-24692-C01 |
0.00
|
48.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-11034-C01 |
0.00
|
112.09
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-26601-C01 |
0.00
|
523.30
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-1009-C01 |
0.00
|
3 892.64
|
Complex for integrated social services for children and youth in Municipality of Vratsa |
BG05M9OP001-2.019-0016-C04 |
22 748.15
|
3 778.14
|
Reconstruction of an existing building for construction of social housing in Gotse Delchev |
BG16RFOP001-1.028-0003-C03 |
1 509 600.00
|
1 760 704.56
|
Improving the quality of the produced packaging by introducing new technological equipment |
BG16RFOP002-2.050-0007-C01 |
1 800.00
|
2 000.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-1070-C01 |
0.00
|
7.42
|
Renovation and modernization of the House of Culture "Peyo Yavorov", Gotse Delchev |
BG16RFOP001-1.028-0005-C04 |
6 363 858.64
|
2 398 816.05
|
Culture and Origins through Mutual Events in South Eastern Europe (COMEandSEE) |
BG06RDNP001-19.355-0004-C01 |
60 480.00
|
97 416.00
|
New social services for children and youth in Municipality of Blagoevgrad |
BG05M9OP001-2.019-0024-C03 |
86.91
|
209.88
|
Strengthening of the MA’s and beneficiaries administrative capacity and ensuring proper functioning of the MA and MC (logistic support, maintenance of facilities etc.) |
BG05M2OP001-4.001-0009-C07 |
8 093.91
|
7 954.80
|
Construction of a gymnasium including equipment and furnishings at the Lyuben Karavelov Primary School, UP-IX school, plot 11 according to the plan of the village of Osikovitsa |
BG06RDNP001-7.005-0001-C05 |
570 000.00
|
391 329.89
|
Services for early childhood development in the Municipality of Blagoevgrad |
BG05M9OP001-2.004-0022-C08 |
325.00
|
239.76
|
Recovering SMEs by improving energy efficiency |
BG16RFOP002-6.002-0742-C01 |
136 038.00
|
272 076.00
|
The cultural heritage of Plovdiv, presented in revitalized, restored and renovated places |
BGCULTURE-1.001-0016-C03 |
60 598.32
|
0.00
|
"Reconstruction of Stara Zagora and Nova Zagora Railway Station Complexes", Phase 2 |
BG16FFPR001-3.001-0003-C01 |
0.00
|
0.00
|
Buidling a school STEM environment in Primary School "Sv. Paisiy Hilendarski" division "Green technologies and sustainable development" |
BG-RRP-1.015-0351-C01 |
17 989.52
|
0.00
|