Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 55 127 TREES
Български

Organization

Identification

Data Export Excel HTML XML Print
Name Address
130823243 NATIONAL RAILWAY INFRASTRUCTURE COMPANY България, гр.София, 1000, бул. Мария Луиза 110

List of projects in which the organization is involved as a beneficiary (26)

List of projects in which the organization is involved as a Partner (5)

List of projects in which the organization is involved as a contractor

Project Name UMIS Number Contracts amount Reported amount
Construction of WSS infrastructure for designated territory, operated by WSS Ruse LTD BG16M1OP002-1.016-0001-C05 0.00 1 497.60
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-14657-C01 0.00 10 111.86
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-1418-C01 0.00 4 463.33
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-16737-C01 214.00 1 712.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-8927-C01 0.00 1 326.51
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-20333-C01 0.00 2 400.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-19902-C01 0.00 3 923.82
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-23563-C01 0.00 9 501.80
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-24890-C01 0.00 1 043.82
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-12459-C01 0.00 10 880.65
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-24099-C01 0.00 114.63
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-20275-C01 0.00 432.00
Completion and reconstruction of water supply and sewerage systems in a separate territory serviced by company "Water supply and sewerage - Yambol" BG16M1OP002-1.016-0003-C03 0.00 369.60
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-21856-C01 0.00 3 529.17
Completion of the preparatory works required to start the construction of the Interconnection Bulgaria - Serbia BG16RFOP002-4.003-0001-C03 0.00 2 085.00
Construction of water supply and sewerage infrastructure on the designated territory served by "Water Supply and Sewerage" Ltd. - Stara Zagora BG16M1OP002-1.016-0013-C06 0.00 312.00
C4.I4:Digital transformati on of the electricity transmission grid BG-RRP-4.004-0001-C01 630.00 0.00

The organization does not participate in projects as a Subcontractor

The organization does not participate in projects as a member of the Consortium

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).