Lot 15 "Road III-107 (Dupnitsa bypass - Blagoevgrad bypass) - Kocherinovo - Rila - Rila Monastery from km 11+010 to km 30+792.57, with a total length 19.782 km, Kyustendil Region" |
BG16RFOP001-7.001-0014-C04 |
222 180.00
|
0.00
|
Improving the educational infrastructure through reconstruction / repair, renovation and implementation of energy efficiency measures in schools and kindergartens in the town of Haskovo |
BG16RFOP001-1.012-0001-C02 |
0.00
|
0.00
|
Struma Motorway – Lot 3.1, Lot 3.3 and Zheleznitsa Tunnel |
BG16M1OP001-2.001-0001-C05 |
0.00
|
0.00
|
Construction of "Kalotina-Sofia" Motorway - Lot 1 "Western arc of Sofia Ring Road (SRR)" , phase 2 |
BG16M1OP001-2.001-0002-C09 |
0.00
|
0.00
|
Quality improvement of the educational environment at TU Sofia for the leading professional priority fields 5.3 "Communication and computer
systems" and 5.13 "General Engineering" through the complete renovation of Block 3 and Block 1 |
BG16RFOP001-3.003-0012-C01 |
2 940.00
|
2 940.00
|
"Project for rehabilitation of water supply and sewerage network and construction of WWTP, Assenovgrad, Bulgaria" |
BG16M1OP002-1.006-0001-C01 |
0.00
|
0.00
|
"Increasing the energy efficiency of 3 residential buildings in the town of Elhovo" |
BG16RFOP001-2.001-0161-C03 |
6 679.56
|
6 750.79
|
Rehabilitation of the urban living environment in the town of Svishtov |
BG16RFOP001-1.036-0001-C02 |
25 800.00
|
25 279.94
|
"Improvement of urban environment in Pernik" throug the implementation of:
1. "Rehabilitation of Teva Neighborhood";
2. "Park of challenges in Voynikovets area";
3. "Bridge on the Struma river, Struma street" |
BG16RFOP001-1.018-0002-C02 |
100 200.00
|
108 022.53
|
"Improvement of urban environment in Pernik" throug the implementation of:
1. "Rehabilitation of Teva Neighborhood";
2. "Park of challenges in Voynikovets area";
3. "Bridge on the Struma river, Struma street" |
BG16RFOP001-1.018-0002-C02 |
0.00
|
0.00
|
"Improvement of urban environment in Pernik" throug the implementation of:
1. "Rehabilitation of Teva Neighborhood";
2. "Park of challenges in Voynikovets area";
3. "Bridge on the Struma river, Struma street" |
BG16RFOP001-1.018-0002-C02 |
0.00
|
0.00
|
Increasing the energy efficiency of buildings of the municipal administration in Elhovo |
BG16RFOP001-2.001-0084-C01 |
4 681.61
|
4 827.00
|
"Increasing the energy efficiency of the building of the Regional Department - Elhovo" |
BG16RFOP001-2.001-0127-C01 |
2 198.08
|
2 265.92
|
Increasing the energy efficiency of residential buildings number 8 in the town of Elhovo. |
BG16RFOP001-2.001-0147-C02 |
11 014.17
|
11 014.17
|
Urban Environment Renovation of Gorna Oryahovitsa Town |
BG16RFOP001-1.027-0003-C01 |
0.00
|
0.00
|
Energy efficiency in the building of the Regional Service "Fire Safety and Population Protection" - Pomorie |
BG16RFOP001-2.001-0031-C01 |
8 760.00
|
8 760.00
|
Energy efficiency in the building of Historical Museum- Pomorie |
BG16RFOP001-2.001-0013-C01 |
10 812.00
|
10 812.00
|
Increasing energy efficiency in multifamily buildings in Pomorie town |
BG16RFOP001-2.001-0140-C01 |
5 760.00
|
5 760.00
|
Energy efficiency in the building of Municipal Administration of Pomorie |
BG16RFOP001-2.001-0035-C01 |
17 796.00
|
17 796.00
|
Energy efficiency in the building of the Regional Department of Police and District Department for Road Management - Pomorie |
BG16RFOP001-2.001-0059-C01 |
13 560.00
|
13 560.00
|
Energy efficiency in buildings of educational infrastructure in the municipality of Pomorie. |
BG16RFOP001-2.001-0038-C02 |
18 780.00
|
18 780.00
|
Lot 1 „Road ІІ-57 Stara Zagora-Radnevo-road ІІ-55 from km 0+250 to km 11+075 and from km 12+460 to km 40+554, with a total length of 38.919 km, regions of Sliven and Stara Zagora” |
BG16RFOP001-7.001-0008-C04 |
0.00
|
0.00
|
Lot 2 "Road II-81 Kostinbrod - Buchin prohod from km 8+200 to km 30+400, with total length of 22.200km, Sofia region" |
BG16RFOP001-7.001-0009-C05 |
0.00
|
0.00
|
"Design and construction of a waste water treatment plant, inlet manifold and partial rehabilitation of the water supply and sewerage network in the city of Elhovo" |
BG16M1OP002-1.009-0004-C03 |
253 300.00
|
303 959.99
|
Building, restoration and renovation of public areas in the city centre of Sofia |
BG16RFOP001-1.001-0002-C07 |
0.00
|
0.00
|
Investment project for construction WWTP and completion of sewerage network in the town of Tutrakan. |
BG16M1OP002-1.009-0002-C03 |
0.00
|
0.00
|
Lot 27 Road II-62 Dupnica-Klisura from km 42+2632 to km 59+07166, with a total lenght 16,80846 km, Kustendil Region |
BG16RFOP001-7.001-0027-C01 |
302 760.00
|
302 760.00
|
Budget line of Department "Monitoring" |
BG16RFOP001-8.002-0004-C09 |
2 160 000.00
|
599 680.87
|
Construction of a Composting plant and a Waste pretreatment plant for municipal solid waste on the territory of Zlatitsa municipality regional waste disposal landfill for the municipalities of Zlatitsa, Anton, Koprivshtitsa, Mirkovo, Pirdop, Chavdar and Chelopech. |
BG16M1OP002-2.006-0003-C03 |
0.00
|
0.00
|
Lot 30 Road ІІІ-208 Duskotna- Aytos from km 65+933 to km 82+749, with a total lenght 16.749 km, Region Burgas " |
BG16RFOP001-7.001-0030-C03 |
194 760.00
|
194 760.00
|
Lot 32 "Road II-23 Ruse - Kubrat from km 0+030 to km 21+550, with total length 21,520 km , Ruse Region“ |
BG16RFOP001-7.001-0032-C07 |
321 360.00
|
333 339.00
|
Lot 33 "Road II-23 Ruse - Kubrat from km 21+550 to km 46+771, with total length 25,221 km , Ruse and Razgrad Regions“
|
BG16RFOP001-7.001-0033-C06 |
464 400.00
|
351 783.00
|