Development of management capacity and growth of "AS Systems" OOD |
BG16RFOP002-2.002-0049-C01 |
15 750.00
|
22 500.00
|
Providing good and safe working conditions in the company ATM – Spasov EOOD |
BG05M9OP001-1.008-1721-C01 |
4 150.00
|
4 150.00
|
Enhancement of the management capacity and growth potential of " Student Network" by integration of an ERP software and certification of internationally recognized standards. |
BG16RFOP002-2.002-0288-C01 |
23 520.00
|
33 600.00
|
Erudita Pharmacy - enterprise for boutique pharmaceutics |
BG16RFOP002-2.002-0480-C02 |
6 965.00
|
9 950.00
|
Quality and safe jobs in Sani top Ltd. |
BG05M9OP001-1.008-0333-C02 |
1 980.00
|
1 980.00
|
Development of more effective business processes in Prosys EOOD |
BG16RFOP002-2.002-0246-C03 |
5 285.00
|
3 775.00
|
Improving the working conditions in "Remart 85" EOOD |
BG05M9OP001-1.008-2116-C01 |
5 500.00
|
5 500.00
|
Better labour conditions and oorganization in Paralel EAD |
BG05M9OP001-1.008-2379-C02 |
7 500.00
|
7 500.00
|
Implementation of energy saving measures to increase the competitiveness of TEH-MA Ltd. |
BG16RFOP002-3.001-0540-C01 |
4 928.40
|
5 476.00
|
Improving the energy efficiency of BCC-95 OOD |
BG16RFOP002-3.001-0627-C01 |
6 210.00
|
6 900.00
|
Modernization of existing plant for sterilized canned fish in the town of Shumen |
BG14MFOP001-5.004-0004-C02 |
4 107.24
|
4 107.24
|
Increasing energy efficiency in Sistemno integrirane EOOD |
BG16RFOP002-3.001-0547-C01 |
980.00
|
4 900.00
|
Improving the energy efficiency of ‘’ENEV’’ LLC |
BG16RFOP002-3.001-0195-C01 |
0.00
|
6 950.00
|
Improving the quality of the work positions in DI AY DI- BUILDING Ltd., Shumen by providing good and safe working conditions |
BG05M9OP001-1.008-0466-C01 |
0.00
|
3 940.00
|
Improving labor conditions and optimization of work in SAV-Razgrad Ltd. |
BG05M9OP001-1.008-0115-C02 |
8 000.00
|
8 000.00
|
IMPROVEMENT OF SAFETY AND WORKING CONDITIONS IN BLURED LTD. |
BG05M9OP001-1.008-0569-C03 |
5 200.00
|
5 200.00
|
Completion and equipping the plant for processing mussels in town of Kavarna |
BG14MFOP001-5.004-0013-C05 |
13 500.00
|
9 900.00
|
BETTER AND SAFER CONDITIONS OF WORK AT "TECHSTROY" LTD |
BG05M9OP001-1.008-0601-C01 |
5 600.00
|
5 600.00
|
"Energy Efficiency in GAP-07 LTD " |
BG16RFOP002-3.001-0026-C01 |
3 645.00
|
4 050.00
|
A better working environment for quality work |
BG05M9OP001-1.008-1021-C01 |
8 700.00
|
8 700.00
|
Implementation of energy efficient equipment and system for energy management in accordance with ISO 50001-2011. |
BG16RFOP002-3.001-0654-C01 |
2 790.00
|
3 100.00
|
"Increasing energy efficiency in company Dikmont Ltd." |
BG16RFOP002-3.001-0858-C01 |
6 965.00
|
9 950.00
|
Energy efficiency in LENOX GROUP EOOD through optimization of process equipment |
BG16RFOP002-3.001-0156-C01 |
12 555.00
|
13 950.00
|
"Safety at work in TABAK COM ENGINEERING" |
BG05M9OP001-1.008-0698-C01 |
8 700.00
|
8 700.00
|
Increasing energy efficiency "Korkos" Ltd. |
BG16RFOP002-3.001-0798-C02 |
6 705.00
|
7 450.00
|
Increase energy efficiency and work processes in Bapa-Sport Ltd. |
BG16RFOP002-3.001-0447-C01 |
7 020.00
|
7 800.00
|
"Sustainable development, by implementing measures for energy and resource efficiency "ZTKI" Ltd." |
BG16RFOP002-3.001-0740-C01 |
10 575.00
|
11 750.00
|
"Energy efficency in Detelina-I Ltd" |
BG16RFOP002-3.001-0314-C01 |
4 400.10
|
4 889.00
|
Implementation of energy efficiency measures in BALKAN - 2006 Ltd in order to achieve stable growth and competitiveness |
BG16RFOP002-3.001-0635-C01 |
2 250.00
|
2 500.00
|
Creating a good and safe working conditions in "ALPETRANS BULGARIA" LTD. |
BG05M9OP001-1.008-1483-C01 |
5 400.00
|
5 400.00
|
Sustainable growth of EKOVAT-BULGARIA Ltd. due to implementation of measures to increase energy and resource efficiency |
BG16RFOP002-3.001-0616-C02 |
7 020.00
|
7 800.00
|
Increasing energy and resource efficiency "Bulmeks" Ltd. by purchasing new machines |
BG16RFOP002-3.001-0213-C01 |
12 510.00
|
13 900.00
|
Increasing energy efficiency and expanding the production capacity of ‘Bulgaria – Tex’ JSC through the implementation of new technologically improved equipmentment and energy management system ISO 50 001 |
BG16RFOP002-3.001-0719-C01 |
2 610.00
|
2 900.00
|
Energy efficiency in Muroll Bulgaria Ltd. |
BG16RFOP002-3.001-0794-C01 |
0.00
|
19 000.00
|
Investments for increasing theenergy efficiency in "Mariva PI" EOOD |
BG16RFOP002-3.001-0771-C02 |
5 085.00
|
5 085.00
|
"Energy efficiency" Demeter - 70 "Ltd." |
BG16RFOP002-3.001-0521-C01 |
1 584.00
|
1 760.00
|
Establishment of a fish and fishery processing factory |
BG14MFOP001-5.005-0007-C04 |
5 400.00
|
2 044.72
|
Energy efficiency for better competitiveness |
BG16RFOP002-3.002-0122-C02 |
3 585.00
|
11 950.00
|
Expansion and modernization of Aquaculture Haskovo SA. |
BG14MFOP001-2.006-0012-C05 |
1 956.00
|
3 912.00
|
Establish a new fish processing factory |
BG14MFOP001-5.005-0004-C03 |
5 476.32
|
5 476.32
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-10137-C01 |
0.00
|
1 427.76
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-9054-C01 |
0.00
|
880.12
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-0502-C01 |
0.00
|
1 173.50
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-0794-C01 |
0.00
|
0.00
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-1170-C01 |
1 173.45
|
1 173.45
|
Support to SMEs carrying out bus transport services to overcome the economic consequences of COVID-19 pandemic. |
BG16RFOP002-2.091-0158-C01 |
0.00
|
782.33
|
Modernization of the fish farm "Haritov Chiflik" |
BG14MFOP001-2.016-0002-C02 |
3 300.00
|
3 300.00
|
Expansion of an existing activity in a new fish factory |
BG14MFOP001-5.014-0007-C02 |
5 800.00
|
5 800.00
|
Recovering SMEs by improving energy efficiency |
BG16RFOP002-6.002-0168-C01 |
4 500.00
|
9 000.00
|
Improvement of the production processes in "Emily Invest 2013" LTD through investments in tangible fixed assets and support for specialized services for development and strengthening of the management capacity of the enterprise. |
BG16RFOP002-2.112-0003-C01 |
20 900.00
|
20 900.00
|