Indicators

Indicator Measure Unit Base Value Target amount Reached amount
1. Technical conditions enabled for the integration of new 2 500 MW production capacity from renewable sources (wind and solar) into the electricity system Мегават 1 842.00 4 342.00 0.00
2. Signing of contracts for upgrade, modernization and digitalization of the national transmission systems No No No
3. Increase of net cross-border transmission capacity by 600 MW Мегават 1 400.00 2 000.00 0.00
4. Technical conditions enabled for the integration of additional 2 500 MW from renewable sources (wind and solar) into the electricity system Мегават 4 342.00 6 342.00 0.00
5. Increase of net cross-border transmission capacity by additional 600 MW Мегават 1 400.00 2 600.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).