BG-RRP-4.032-0136-C01
Combined project TUTRAKAN for construction of new local electricity storage faciltiies ("BESS"), behind the meter, with an installed capacity of 1.4MW and capacity of 3MWh to a newly built and entered into exploitation photovoltaic power plant Tutrakan with nominal generation capacity of 4MW and nominal installed capacity of 3.6 MW AC
RRF ==>
Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
20.02.2025
20.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Silistra (BG325), Tutrakan