Improving production capacity in „DIK - ENGINEERING“ LTD |
BG16RFOP002-2.001-0881-C01 |
0.00
|
0.00
|
Improvement of Production Capacity and Export Potential of "Operation Management Services" Ltd. |
BG16RFOP002-2.001-0743-C01 |
102 977.00
|
147 110.00
|
Modernization of the production processes in Bulcraft Ltd. |
BG16RFOP002-2.001-0717-C01 |
185 988.00
|
309 980.00
|
"Modernization and improvement of production capacity, technologies and process management used by THETA-CONSULT Ltd. for radiation control of environmental objects and introducing new technologies". |
BG16RFOP002-2.001-1257-C01 |
79 784.52
|
113 977.89
|
Improving the production capacity and enhancing the export potential of "Simat" AD |
BG16RFOP002-2.001-0684-C01 |
221 204.37
|
368 673.95
|
Improving energy efficiency in "INEX TRADE" LTD |
BG16RFOP002-3.001-0218-C01 |
212 549.82
|
354 249.71
|
Increasing energy efficiency in ET "Ivaylo Neshev - NESH-I" |
BG16RFOP002-3.001-0736-C01 |
327 166.00
|
467 380.00
|
Competitiveness through Energy Efficiency and effectiveness |
BG16RFOP002-3.001-0007-C01 |
147 168.00
|
210 240.00
|
Increasing energy efficiency in TANATOS Ltd. |
BG16RFOP002-3.001-0293-C01 |
1 486 520.00
|
2 123 600.00
|
"Competitiveness through Energy Efficiency and effectiveness" |
BG16RFOP002-3.001-0059-C01 |
635 516.90
|
1 059 194.84
|
Improving the energy efficiency of ‘’TICHA - SHUMEN’’ LLC |
BG16RFOP002-3.001-0297-C01 |
298 459.00
|
426 370.00
|
Improving the energy efficiency of RV ENGINEERING Ltd |
BG16RFOP002-3.001-0198-C01 |
35 175.00
|
50 250.00
|
Energy Efficiency for sustainable growth |
BG16RFOP002-3.001-0590-C01 |
314 614.30
|
449 449.00
|
Implementing measures for energy efficiency at Euroquartz - MV LTD, town of Pleven |
BG16RFOP002-3.001-0287-C02 |
583 707.38
|
833 867.68
|
Increasing energy efficiency in company Beton Montana Ltd. |
BG16RFOP002-3.001-0800-C01 |
955 160.70
|
1 365 515.28
|
Improving energy efficiency in the "Central repair base 2001" Ltd. |
BG16RFOP002-3.001-0056-C01 |
299 007.10
|
427 153.00
|
Enhancement of the energy efficiency of “Interhold” Ltd., through investments in new high-tech equipment |
BG16RFOP002-3.001-0565-C01 |
625 241.40
|
642 665.00
|
"Energy Efficiency in GAP-07 LTD " |
BG16RFOP002-3.001-0026-C01 |
1 440 675.53
|
2 058 107.91
|
Increasing the energy efficiency of "HMG Agro" Ltd by installation of energy-saving technological equipment. |
BG16RFOP002-3.001-0043-C01 |
340 719.91
|
498 420.00
|
Energy efficency |
BG16RFOP002-3.001-0662-C01 |
817 341.36
|
1 167 630.51
|
"Sustainable development Koprivlen-mramor Ltd. Energy Efficiency" |
BG16RFOP002-3.001-0018-C01 |
1 013 120.50
|
1 447 315.00
|
Increasing the energy efficiency of KOREKTBETON Ltd. |
BG16RFOP002-3.001-0699-C01 |
783 003.60
|
2 208 132.00
|
Energy efficency |
BG16RFOP002-3.001-0410-C01 |
376 497.28
|
537 853.25
|
"Increasing Energy Efficiency in GLAVBOLGARSTROY AD" |
BG16RFOP002-3.002-0044-C01 |
869 064.94
|
3 470 659.80
|
Increasing the energy efficiency of TERA Ltd. |
BG16RFOP002-3.001-0020-C01 |
321 720.00
|
459 600.00
|
"Competitiveness of" GBS Infrastructurno stroitelstvo" AD through Energy Efficiency" |
BG16RFOP002-3.002-0119-C01 |
515 361.21
|
2 061 444.82
|
Improving the energy efficiency at „INERTNI MATERIALI-YAMBOL” JSC |
BG16RFOP002-3.002-0093-C01 |
78 513.75
|
157 500.00
|
Increasing the energy efficiency of "Valentin Petrov 2004" Ltd by implementing energy saving measures for sustainable growth and competitiveness |
BG16RFOP002-3.001-0625-C01 |
403 046.00
|
287 890.00
|
Improving the energy efficiency and production capacity of BULNED-AMD Ltd. |
BG16RFOP002-3.001-0081-C02 |
988 680.00
|
1 412 400.00
|
Improving energy efficiency of GARANTSTROY - GANCHO GROZEV |
BG16RFOP002-3.001-0044-C01 |
144 550.00
|
206 500.00
|
Improve energy efficiency “Doroslava stroy” Ltd., Burgas |
BG16RFOP002-3.001-0384-C01 |
823 130.00
|
1 175 900.00
|
"Increasing the energy efficiency of "Galera 07" Ltd , through introduction into production of new energy efficient equipment" |
BG16RFOP002-3.001-0783-C01 |
197 120.00
|
281 600.00
|
Increase of the energy efficiency and capacity for construction services of “Comfort BG 2” Ltd due to purchase of new technic and equipment |
BG16RFOP002-3.001-0930-C01 |
168 490.00
|
240 700.00
|
Increasing energy efficiency in Patno Stroitelstvo AD, Dobrich |
BG16RFOP002-3.002-0020-C01 |
262 050.00
|
524 100.00
|
Reducing energy consumption and increasing energy efficiency in Waterbuild Ltd. |
BG16RFOP002-3.001-0141-C01 |
339 539.13
|
499 984.00
|
"Increasing the energy efficiency of "Todorov and son 99 "Ltd. |
BG16RFOP002-3.001-0741-C01 |
375 300.00
|
625 500.00
|
Reducing energy consumption and fuel costs in the "Evropat 2005" Ltd. , through investment in high technology equipment |
BG16RFOP002-3.001-0266-C01 |
561 518.65
|
1 020 943.00
|
Increasing energy efficiency in Enterprise Leomet ltd, Popovtsi village in order to increase
competitiveness of the enterprise. |
BG16RFOP002-3.001-0530-C02 |
98 287.00
|
140 410.00
|
Increasing energy efficiency in HOUS MADING Ltd |
BG16RFOP002-3.001-0374-C01 |
1 052 100.00
|
1 503 000.00
|
Energy efficiency improvement in Minstroy Maritsa Iztok AD |
BG16RFOP002-3.002-0140-C01 |
1 398 597.50
|
2 797 195.00
|
Increasing energy efficiency and expanding production capacity in Eco Tradex Group Jsc |
BG16RFOP002-3.002-0005-C01 |
171 135.00
|
342 270.00
|
"Efficient use of resources in Next Build Ltd" |
BG16RFOP002-3.004-0010-C01 |
609 719.00
|
609 719.00
|
Construction of a Composting Installation for Separately Collected Green and/or Biodegradable Waste |
BG16M1OP002-2.005-0007-C02 |
1 512 319.67
|
2 353 020.15
|
Design and Construction of a Composting plant and a Waste pretreatment plant for municipal solid waste on the territory of Madan municipality regional waste disposal landfill for the municipalities of Madan, Zlatograd and Nedelino. |
BG16M1OP002-2.002-0015-C03 |
535 000.00
|
642 000.00
|
Investments to buy a wheel excavator with a front loader |
BG06RDNP001-19.151-0006-C06 |
134 480.00
|
134 400.00
|
Improving the production capacity of TISINA LTD |
BG16RFOP002-2.040-0081-C01 |
87 374.00
|
124 820.00
|
"Construction of a municipal composting installation for separately collected biodegradable and green waste to municipality of Harmanli" |
BG16M1OP002-2.005-0005-C03 |
667 875.00
|
802 905.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-1679-C01 |
0.00
|
480.62
|
Construction of a Composting plant and a Waste pretreatment plant for municipal solid waste on the territory of Zlatitsa municipality regional waste disposal landfill for the municipalities of Zlatitsa, Anton, Koprivshtitsa, Mirkovo, Pirdop, Chavdar and Chelopech. |
BG16M1OP002-2.006-0003-C03 |
481 518.00
|
648 000.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-16450-C01 |
0.00
|
2 894.41
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-13374-C01 |
0.00
|
699.60
|
Increasing the capacity of "MERY M 2015" Ltd and
implementation of an innovative service - demonstrative archeology. |
BG06RDNP001-19.163-0005-C02 |
71 100.00
|
94 800.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-23741-C01 |
0.00
|
206.36
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-25935-C01 |
0.00
|
443.50
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-15139-C01 |
0.00
|
477.50
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-26343-C01 |
0.00
|
1 009.21
|
Purchase of an asphalt recycling production line in the village of Ovcharovo, Dobrich-rural |
BG06RDNP001-6.004-0167-C02 |
687 948.00
|
267 948.71
|
Improving production capacity and expanding export potential of the Company Euroquarts – MV Ltd. |
BG16RFOP002-2.040-0262-C02 |
732 900.00
|
1 047 000.00
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-0151-C01 |
0.00
|
4 893.62
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-1437-C01 |
0.00
|
690.00
|
Construction of anaerobic installation for source - separated organic waste on the territory of Burgas Region |
BG16M1OP002-2.004-0002-C04 |
2 818 500.00
|
3 600 000.00
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-0720-C01 |
0.00
|
0.00
|
Improving the production capacity in Sigma Invest EOOD |
BG16RFOP002-2.040-0829-C01 |
25 865.00
|
36 950.00
|
Equipment for the production of metal products |
BG06RDNP001-6.004-0264-C01 |
269 509.24
|
539 026.75
|
Support to SMEs carrying out bus transport services to overcome the economic consequences of COVID-19 pandemic. |
BG16RFOP002-2.091-0136-C01 |
0.00
|
395.00
|
Purchase of a combined backhoe loader.
|
BG06RDNP001-19.173-0012-C01 |
75 840.00
|
151 680.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-27277-C01 |
0.00
|
2 269.20
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-1020-C01 |
0.00
|
0.00
|
Design and construction of a composting installation and an installation for preliminary treatment of waste for municipalities Dupnitsa, Bobov Dol and Sapareva Banya |
BG16M1OP002-2.002-0008-C07 |
293 049.00
|
446 235.60
|
CONSTRUCTION AND TRANSFORMATION OF AN EXISTING TEXTILE WORKER AND PURCHASE OF TECHNOLOGICAL EQUIPMENT |
BG06RDNP001-8.001-0028-C03 |
189 813.30
|
189 813.30
|
Improving the environmental protection status of forest natural habitats and supporting the ecosystems services provided by forest, through the application of forestry practices and afforestation on the territory of the North-West State Enterprise. |
BG16M1OP002-3.035-0003-C02 |
588 500.00
|
588 500.00
|
Construction and equipment of a company for wood processing in Zlatograd |
BG06RDNP001-8.001-0143-C02 |
0.00
|
139 800.00
|
Purchase of a crawler excavator |
BG06RDNP001-19.442-0001-C03 |
293 220.00
|
0.00
|
Purchase of specialized equipment for excavation and earthworks
|
BG06RDNP001-19.410-0007-C03 |
252 975.00
|
0.00
|
Technological Modernization of the Enreprise |
BG-RRP-3.004-0106-C01 |
122 239.38
|
244 478.75
|
Purchase of a wheeled multifunctional excavator for mechanized services on the territory of Sredets municipality |
BG06RDNP001-19.624-0001-C02 |
160 000.00
|
0.00
|
Modernization of agriculture |
BG06RDNP001-19.641-0008-C03 |
42 500.00
|
85 000.00
|
Investment aimed at the purchase of construction equipment in order to increase the competitiveness of the newly created Stroytech 2006 EOOD |
BG06RDNP001-19.045-0018-C01 |
330 450.00
|
0.00
|
Improvement energy efficiency in Cursor Ltd |
BGENERGY-2.003-0008-C01 |
341 400.00
|
157 900.00
|
Design and construction of anaerobic installation for separately collected biodegradable waste for a regional waste management system of Blagoevgrad Region |
BG16M1OP002-2.004-0001-C06 |
0.00
|
0.00
|
Purchase of a combined backhoe loader. |
BG06RDNP001-19.654-0004-C01 |
162 200.00
|
172 200.00
|
Modernization of the fish farm in the "Kartelka" reservoir, Karnobat municipality |
BG14MFOP001-2.019-0008-C02 |
80 500.00
|
161 000.00
|
Purchase of construction machinery and equipment |
BG06RDNP001-19.680-0003-C03 |
107 197.50
|
0.00
|
Second combined procedure for design and construction of composting installations and pre-treatment faciliities installations for municipal weste "under Axis 2 of OPE 2014-2020 of RAWM - Assenovgrad Region" |
BG16M1OP002-2.006-0001-C06 |
931 681.10
|
1 258 320.00
|
Purchase of new equipment for the activity of BENDIDA HOLIDAY LTD |
BG06RDNP001-19.508-0009-C03 |
195 578.04
|
0.00
|
Purchase of specialized equipment for Poultry Farm for raising broiler chickens |
BG06RDNP001-4.008-0236-C06 |
0.00
|
0.00
|
Purchase of a Mini front loader for construction services |
BG06RDNP001-19.670-0002-C02 |
98 476.04
|
0.00
|