Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 55 107 TREES
Български

Organization

Identification

Data Export Excel HTML XML Print
Name Address
119081953 "VDH" AD България, гр.София, 1000, БУЛ. "Цар Освободител" № 6

List of projects in which the organization is involved as a beneficiary (1)

The organization does not participate in projects as a Partner

List of projects in which the organization is involved as a contractor

Project Name UMIS Number Contracts amount Reported amount
Second phase on project "Rehabilitation of the water supply and sewerage system in town of Bansko with construction of a WWTP BG16M1OP002-1.005-0003-C01 0.00 0.00
Face To Face services in CESA (Center for employment and social assistance) BG05M9OP001-3.002-0001-C05 0.00 0.00
Green and accessible urban environment for the residents of Stara Zagora - phase ІІ BG16RFOP001-1.006-0001-C02 7 052 352.43 6 727 425.73
Reconstruction of the central pedestrian zone BG16RFOP001-1.010-0002-C02 10 417 646.53 11 245 275.01
Construction, complete renovation / reconstruction of 26 schools and kindergartens on the territory of Sofia Municipality BG16RFOP001-1.001-0001-C05 2 283 493.61 2 286 166.12
Rehabilitation and new spatial solutions in the pedestrian zone of the town's central area and rehabilitation of the "Todor Kirkov" Square, Varosha quarter, town of Lovech BG16RFOP001-1.020-0001-C02 1 195 737.52 1 178 702.74
Strengthening of landslide SLV 20.07613-09 on the territory of village 'Kachulka' (former village 'Kachulka'), Sliven Municipality BG16M1OP002-4.003-0012-C01 339 239.59 438 296.35
Restoration and conservation of habitats and species in Central Balkan National Park BG16M1OP002-3.007-0006-C07 0.00 0.00
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage 1 BG16M1OP001-1.001-0003-C05 13 210 113.99 16 144 635.67
Modernization of the Sofia - Plovdiv railway line: railway section Elin Pelin - Kostenets BG16M1OP001-1.001-0004-C03 0.00 0.00
Construction of a covered boat shelter in the aquatory to the west of the Fishing port area (former Chengene skele area), Burgas Municipality BG14MFOP001-1.009-0004-C06 0.00 0.00
Green spaces development and physical environment improvement of the Station Garden in Stara Zagora BG16RFOP001-1.006-0005-C01 4 000 000.00 4 374 854.14
Reconstruction of Stara Zagora and Nova Zagora Railway Station Complexes - Phase 1 BG16M1OP001-3.001-0009-C05 3 375 270.34 2 704 205.04
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-10065-C01 0.00 2 407.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-17036-C01 0.00 1 906.92
Sofia Integrated Urban Transport - II stage BG16RFOP001-1.041-0001-C07 47 747 139.77 38 599 925.16
Prevention and counteraction of landslide processes on the Republican road network - Phase 2 BG16M1OP002-4.003-0010-C05 0.00 0.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-6956-C01 0.00 2 587.05
Construction of water supply and sewerage infrastructure on the designated territory serviced by Water Supply and Sewerage Ltd. - Vratsa BG16M1OP002-1.016-0002-C03 354 006.45 442 554.00
Construction of water supply and sewerage infrastructure on the designated territory serviced by Water Supply and Sewerage Ltd., Vidin BG16M1OP002-1.016-0006-C06 5 258 696.85 0.00
Restoration of damage to forests of the municipality It has been haunted by forest fires, natural disasters and catastrophic events BG06RDNP001-8.004-0037-C05 621 873.04 715 144.78
Lot 34 „Road III-559 Polski gradezt – Topolovgrad - Ustrem from km 4+500 to km 23+520 and from km 35+060 to km 39+450, with a total length of 23,41 km, region of Haskovo” BG16RFOP001-7.001-0034-C05 0.00 0.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-3922-C01 0.00 0.00
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 BG16RFOP002-2.073-3922-C01 0.00 4 594.21
Modernization of Sofia – Dragoman – Serbian border Railway line: section Voluyak – Dragoman phase 1 BG16M1OP001-1.001-0006-C01 0.00 0.00
From East2West - 2. Access to OEM Corridor through the Core Port of Burgas: Rehabilitation of the rail connections towards the Trans-European Transport Network. BG16M1OP001-1.001-0005-C03 6 537 096.44 7 247 038.85
Integrated Water Project for the District of Burgas BG16M1OP002-1.016-0011-C07 3 149 593.76 504 808.80
Recovering SMEs by improving energy efficiency BG16RFOP002-6.002-0923-C01 149 749.50 299 499.00
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage II BG16FFPR001-1.001-0001-C01 9 042 618.89 0.00

The organization does not participate in projects as a Subcontractor

List of projects in which the organization is involved as a member of the Consortium (10)

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).