Development of more effective business processes in Prosys EOOD |
BG16RFOP002-2.002-0246-C03 |
1 848.00
|
2 640.00
|
Development of management capacity and growth of "AS Systems" OOD |
BG16RFOP002-2.002-0049-C01 |
15 890.00
|
22 700.00
|
Providing good and safe working conditions in the company ATM – Spasov EOOD |
BG05M9OP001-1.008-1721-C01 |
61 136.00
|
61 136.00
|
Enhancement of the management capacity and growth potential of " Student Network" by integration of an ERP software and certification of internationally recognized standards. |
BG16RFOP002-2.002-0288-C01 |
22 260.00
|
31 800.00
|
Implementation of energy saving measures to increase the competitiveness of TEH-MA Ltd. |
BG16RFOP002-3.001-0540-C01 |
8 055.00
|
8 950.00
|
Erudita Pharmacy - enterprise for boutique pharmaceutics |
BG16RFOP002-2.002-0480-C02 |
7 665.00
|
10 950.00
|
Improving the quality of jobs "Chechosan" Ltd. |
BG05M9OP001-1.008-0122-C01 |
24 900.00
|
24 900.00
|
Improving the energy efficiency of BCC-95 OOD |
BG16RFOP002-3.001-0627-C01 |
11 610.00
|
12 900.00
|
Increasing energy efficiency in Sistemno integrirane EOOD |
BG16RFOP002-3.001-0547-C01 |
1 964.70
|
5 900.00
|
Improving the energy efficiency of ‘’Passat Press’’ Ltd. |
BG16RFOP002-3.001-0223-C01 |
0.00
|
7 950.00
|
Implementing measures for energy efficiency at Euroquartz - MV LTD, town of Pleven |
BG16RFOP002-3.001-0287-C02 |
8 055.00
|
8 950.00
|
Good and safe working conditions 2016 |
BG05M9OP001-1.008-0511-C02 |
0.00
|
12 000.00
|
Improving the working conditions in "Remart 85" EOOD |
BG05M9OP001-1.008-2116-C01 |
6 000.00
|
6 000.00
|
Increasing the energy efficiency of Sira Ltd. enterprise |
BG16RFOP002-3.001-0764-C01 |
6 642.00
|
7 380.00
|
Improving working and social environment in QB engineering ltd. |
BG05M9OP001-1.008-1244-C01 |
18 265.00
|
18 265.00
|
Better labour conditions and oorganization in Paralel EAD |
BG05M9OP001-1.008-2379-C02 |
12 500.00
|
12 500.00
|
Implementation of measures to improve energy efficiency in Plast - 60 EOOD |
BG16RFOP002-3.001-0448-C01 |
4 050.00
|
4 500.00
|
"Sustainable development Koprivlen-mramor Ltd. Energy Efficiency" |
BG16RFOP002-3.001-0018-C01 |
9 585.00
|
10 650.00
|
IMPROVEMENT OF SAFETY AND WORKING CONDITIONS IN BLURED LTD. |
BG05M9OP001-1.008-0569-C03 |
9 000.00
|
9 000.00
|
Integrated measures to ensure a better and safer work environment in Calcit AD |
BG05M9OP001-1.008-0961-C01 |
10 700.00
|
10 700.00
|
Improvement of the energy efficiency of „OLIMPMIR “ LLC |
BG16RFOP002-3.001-0152-C01 |
0.00
|
8 950.00
|
"Energy Efficiency in GAP-07 LTD " |
BG16RFOP002-3.001-0026-C01 |
10 710.00
|
11 900.00
|
Modernization of existing plant for sterilized canned fish in the town of Shumen |
BG14MFOP001-5.004-0004-C02 |
3 050.00
|
3 050.00
|
Improving the energy efficiency of “RAZGRAD POLIGRAF” LLC |
BG16RFOP002-3.001-0485-C01 |
0.00
|
5 950.00
|
Improving the energy efficiency of ‘’ENEV’’ LLC |
BG16RFOP002-3.001-0195-C01 |
0.00
|
6 950.00
|
Improving the quality of the work positions in DI AY DI- BUILDING Ltd., Shumen by providing good and safe working conditions |
BG05M9OP001-1.008-0466-C01 |
4 980.00
|
4 980.00
|
Developing management capacity "WITMIND" Ltd. by introducing a system for planning and resource management / ERP system / and implementation and certification of quality management |
BG16RFOP002-2.002-0112-C01 |
15 330.00
|
21 900.00
|
Implementation of energy efficient equipment and system for energy management in accordance with ISO 50001-2011. |
BG16RFOP002-3.001-0654-C01 |
3 510.00
|
3 900.00
|
Improving labor conditions and optimization of work in SAV-Razgrad Ltd. |
BG05M9OP001-1.008-0115-C02 |
12 000.00
|
12 000.00
|
Completion and equipping the plant for processing mussels in town of Kavarna |
BG14MFOP001-5.004-0013-C05 |
9 900.00
|
9 900.00
|
Investment for Sustainable Development of METALTECHNIK AD |
BG16RFOP002-3.001-0826-C01 |
10 710.00
|
11 900.00
|
"Increasing energy efficiency in company Dikmont Ltd." |
BG16RFOP002-3.001-0858-C01 |
6 265.00
|
8 950.00
|
Energy efficiency in LENOX GROUP EOOD through optimization of process equipment |
BG16RFOP002-3.001-0156-C01 |
882.00
|
980.00
|
Increasing the energy efficiency in "Ziesto" Plc. |
BG16RFOP002-3.001-0522-C01 |
5 400.00
|
6 000.00
|
"Energy efficency in Detelina-I Ltd" |
BG16RFOP002-3.001-0314-C01 |
3 330.00
|
3 700.00
|
Providing of a good and safe working conditions for the employed in Diel Commerce Ltd. |
BG05M9OP001-1.008-0732-C01 |
5 800.00
|
5 800.00
|
Increasing energy efficiency "Korkos" Ltd. |
BG16RFOP002-3.001-0798-C02 |
6 705.00
|
7 450.00
|
Increasing energy efficiency in PROGALVIS Ltd. |
BG16RFOP002-3.001-0312-C01 |
3 555.00
|
3 950.00
|
Increase energy efficiency and work processes in Bapa-Sport Ltd. |
BG16RFOP002-3.001-0447-C01 |
3 555.00
|
3 950.00
|
"Sustainable development, by implementing measures for energy and resource efficiency "ZTKI" Ltd." |
BG16RFOP002-3.001-0740-C01 |
7 092.00
|
7 880.00
|
Good and safe working conditions 2016 |
BG05M9OP001-1.008-0119-C03 |
0.00
|
15 000.00
|
Implementation of energy efficiency measures in BALKAN - 2006 Ltd in order to achieve stable growth and competitiveness |
BG16RFOP002-3.001-0635-C01 |
2 250.00
|
2 500.00
|
Sustainable growth of EKOVAT-BULGARIA Ltd. due to implementation of measures to increase energy and resource efficiency |
BG16RFOP002-3.001-0616-C02 |
3 555.00
|
3 950.00
|
Increasing energy efficiency in Anes- 96 |
BG16RFOP002-3.001-0921-C01 |
6 300.00
|
9 000.00
|
Increasing energy and resource efficiency "Bulmeks" Ltd. by purchasing new machines |
BG16RFOP002-3.001-0213-C01 |
810.00
|
900.00
|
Investments for increasing theenergy efficiency in "Mariva PI" EOOD |
BG16RFOP002-3.001-0771-C02 |
14 880.00
|
10 000.00
|
MEGAENERGY |
BG16RFOP002-3.002-0017-C02 |
1 950.00
|
3 900.00
|
Establishment of a fish and fishery processing factory |
BG14MFOP001-5.005-0007-C04 |
5 850.00
|
2 215.12
|
Establish a new fish processing factory |
BG14MFOP001-5.005-0004-C03 |
5 850.00
|
5 850.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-10137-C01 |
0.00
|
980.00
|
Overcoming the shortage of funding and the lack of liquidity caused by the epidemic outbreak of COVID-19 |
BG16RFOP002-2.073-9054-C01 |
0.00
|
0.00
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-0502-C01 |
0.00
|
900.00
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-0794-C01 |
0.00
|
0.00
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-1170-C01 |
1 950.00
|
1 950.00
|
Support to SMEs carrying out bus transport services to overcome the economic consequences of COVID-19 pandemic. |
BG16RFOP002-2.091-0158-C01 |
0.00
|
920.00
|
Modernization of the fish farm "Haritov Chiflik" |
BG14MFOP001-2.016-0002-C02 |
3 300.00
|
3 300.00
|
Expansion of an existing activity in a new fish factory |
BG14MFOP001-5.014-0007-C02 |
5 200.00
|
4 900.00
|
Recovering SMEs by improving energy efficiency |
BG16RFOP002-6.002-0168-C01 |
3 900.00
|
7 800.00
|