Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 57 550 TREES
Български

Programme: Environment

Planning region: All

Identification

BG16M1OP002-2.005-0014-C02
"Design and construction of composting installation for separately collected green and biodegradable waste of Yambol municipality"
ERDF ==> Environment
000697371 Ministry of environment and water
03.07.2019
03.07.2019
08.06.2022
Closed (completion date)
Location of Performance
  • Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Yambol (BG343), Yambol

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).