Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 71 311 TREES
Български

Programme: Environment 2014-2020

Planning region: All

Identification

BG16M1OP002-2.002-0017-C05
Design and construction of additional infrastructure /installation for pretreatment of household waste and composting installations for separately collected biodegradable and/or green waste/ for the development of the Regional system for waste management - Blagoevgrad, including the municipalities of Blagoevgrad, Simitli, Rila, Kocherinovo and Boboshevo.
ERDF ==> Environment 2014-2020
000697371 Ministry of environment and water
23.04.2018
23.04.2018
31.12.2025
Closed (completion date)
Location of Performance

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).