Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 55 065 TREES
Български

Programme: Environment

Planning region: All

Identification

BG16M1OP002-2.005-0018-C04
Design and construction of the territory of Krichim Municipality of a composting plant for separately collected green and / or biodegradable waste generated by the municipality of Krichim and the municipality of Perushtitsa, including provision of the necessary equipment and equipment and equipment for separate collection of green and biodegradable waste "
ERDF ==> Environment
000697371 Ministry of environment and water
27.05.2020
11.06.2020
24.01.2023
Closed (completion date)
Location of Performance

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).