List of projects in which the organization is involved as a beneficiary

Project Name Home Total Grant Self-financing by the Beneficiary Actual amounts paid Duration (months) Status of Implementation of the Contract/Order of the Grant
Technical assistance for preparation of project "Modernization of the Sofia-Pernik-Radomir-Gyueshevo-border with Republic of North Macedonia railway line" 24.02.2015 15 400 686.81 12 842 932.36 2 557 754.45 11 890 332.37 107 In execution (starting date)
Technical assistance for preparation of project "Modernization of railway line Sofia - border with Republic of Serbia" 01.03.2015 2 284 676.22 1 776 207.22 508 469.00 1 776 207.22 54 Closed (completion date)
Technical assistence the capacity of NRIC as beneficiary under OP TTI years 2014-2020 by continuing the best practices identified during the previous period and the inclusion of new measures to achieve the required capacity for preparation, implementation, monitoring and control of projects funded by means of the ESIF 01.06.2015 7 884 342.99 7 884 342.99 0.00 7 884 342.99 67 Closed (completion date)
Modernization of the Sofia - Plovdiv railway line: railway section Elin Pelin - Kostenets 01.01.2016 1 301 273 600.20 539 497 177.20 761 776 423.00 388 349 574.08 96 In execution (starting date)
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage 1 01.02.2016 877 201 467.35 346 367 898.07 530 833 569.28 336 629 739.74 95 In execution (starting date)
Reconstruction of Karnobat Railway Station Complex 01.02.2016 6 266 520.67 5 158 475.36 1 108 045.31 5 158 475.36 86 Closed (completion date)
Reconstruction of Stara Zagora and Nova Zagora Railway Station Complexes - Phase 1 01.02.2016 25 321 076.94 12 279 248.85 13 041 828.09 12 202 625.32 95 In execution (starting date)
Reconstruction of Poduyane, Iskar and Kazichene Railway Station Complexes 01.05.2016 7 395 396.81 5 639 090.99 1 756 305.82 5 639 090.99 92 Closed (completion date)
Rehabilitation of Railway Infrastructure along Sections of the Plovdiv - Burgas Railway Line - reconstruction, repair and modernization of traction sub-stations Burgas, Karnobat and Yambol 18.07.2016 21 328 680.39 16 506 239.51 4 822 440.88 16 572 117.63 39 Closed (completion date)
Modernization of the railway section Septemvri-Plovdiv – part of the Trans-European railway network – construction of four overpasses” 19.08.2016 19 726 024.18 15 937 900.60 3 788 123.58 15 937 900.60 21 Closed (completion date)
Technical assistance to cover the costs of the support provided by EIB to NRIC in the field of project preparation and management under OPTTI Priority axis 4 20.03.2017 873 460.66 872 160.66 1 300.00 872 160.66 24 Closed (completion date)
Technical assistance to cover the costs associated with managing, indexing, storing and implementation of electronic archive of EU-funded project documents 13.09.2017 0.00 0.00 0.00 0.00 24 Terminated (termination date)
Design and implementation of Train operation control system in NRIC including Dynamic Rolling Stock Parameters Measurement and Monitoring System 30.01.2018 7 143 725.75 5 380 945.75 1 762 780.00 5 380 945.75 68 Closed (completion date)
Purchase of two new off-road motor vehicles for facilitating NRIC in monitoring and controlling OPTTI funded projects 05.06.2018 244 571.32 190 640.10 53 931.22 190 640.10 60 Closed (completion date)
Modernization of Sofia – Dragoman – Serbian border Railway line: section Voluyak – Dragoman phase 1 20.05.2019 304 333 486.81 166 208 229.41 138 125 257.40 95 117 770.86 55 In execution (starting date)
Rehabilitation, overhaul and modernization of Varna and Razgrad Traction Power Stations, and construction of Ruse Traction Power Station and introduction of a system for remote control and telesignaling - SCADA, Phase 1. 21.05.2019 43 945 717.58 19 996 587.82 23 949 129.76 18 567 390.86 55 In execution (starting date)
Technical assistance for preparation of complementary projects under PA 1 of OPTTI 2014- 2020 with beneficiary NRIC 03.08.2020 112 800.00 94 000.00 18 800.00 94 000.00 31 Closed (completion date)
Support to the administrative capacity of NRIC SDIP Directorate in relation to its duties for programming, preparation, implementation, monitoring and control of the OPTTI 2014-2020 co-financed railway projects and for the preparation of OPTC 30.10.2020 2 706 036.25 2 705 792.38 243.87 2 705 792.38 31 Closed (completion date)
From East2West - 2. Access to OEM Corridor through the Core Port of Burgas: Rehabilitation of the rail connections towards the Trans-European Transport Network. 06.01.2021 7 667 450.77 6 369 305.76 1 298 145.01 6 369 305.76 36 Closed (completion date)
Technical assistance for preparation of investment project "Development of railway junctions Ruse, Gorna Oryahovitsa and Varna" 01.03.2021 0.00 0.00 0.00 0.00 30 Terminated (termination date)
C8.I4 "Intermodal terminal in Ruse" 01.03.2022 51 949 433.00 51 949 433.00 0.00 0.00 48 In execution (starting date)
C8.I3 "Digitalisation in railways transport and ERTMS" 01.04.2022 205 860 112.00 205 860 112.00 0.00 0.00 52 In execution (starting date)
Support for SDIP Directorate at NRIC related to the management and implementation of the railway projects financed by OPTTI 2014-2020 01.01.2023 1 597 586.88 1 597 586.88 0.00 1 597 586.88 12 Closed (completion date)
Feasibility studies for deployment of ERTMS 12.03.2024 6 240 084.51 6 240 084.51 0.00 0.00 24 In execution (starting date)
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage II 20.03.2024 731 321 716.80 306 929 553.87 424 392 162.93 30 692 955.39 24 In execution (starting date)
"Reconstruction of Stara Zagora and Nova Zagora Railway Station Complexes", Phase 2 23.05.2024 21 964 668.25 9 685 419.39 12 279 248.86 968 541.94 78 In execution (starting date)

List of projects in which the organization is involved as a Partner (5)

List of projects in which the organization is involved as a contractor (2)

The organization does not participate in projects as a Subcontractor

The organization does not participate in projects as a member of the Consortium

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).