Struma Motorway – Lot 3.1, Lot 3.3 and Zheleznitsa Tunnel |
BG16M1OP001-2.001-0001-C05 |
0.00
|
0.00
|
Preparation and implementation of a project for development of water and wastewater infrastrucutre in agglomeration resort "Golden Sands", Municipality of Varna |
BG16M1OP002-1.005-0006-C02 |
24 300 000.00
|
29 146 498.99
|
Aesthetization and Modernization of the Urban Environment in Varna |
BG16RFOP001-1.002-0002-C03 |
3 759 065.84
|
3 937 508.77
|
"Reconstruction and rehabilitation of Albena Square - Silistra" |
BG16RFOP001-1.031-0003-C01 |
0.00
|
0.00
|
Integrated Water Project for Dobrich - Phase I |
BG16M1OP002-1.006-0003-C05 |
25 041 626.27
|
26 818 448.17
|
"Completion of wastewater treatment plants (WWTP ) - Vidin - Second Phase " |
BG16M1OP002-1.005-0007-C04 |
15 707 916.79
|
18 950 561.48
|
Increasing energy efficiency in multifamily buildings in Novi Pazar - II |
BG16RFOP001-2.001-0123-C02 |
157 131.10
|
157 131.09
|
Lot 4 „Road ІІ-29 Varna – Dobrich from km 20+394.73 to km 23+199.86 and from km 25+342 to km 38+100.31 with total length of 15,563 km, regions of Varna and Dobrich” |
BG16RFOP001-7.001-0004-C04 |
0.00
|
0.00
|
Improvement, upgrading and reconstruction of infrastructure in the area with potential for economic development in Dobrich |
BG16RFOP001-1.011-0002-C02 |
1 077 777.32
|
1 053 330.30
|
Varna Integrated Urban Transport - 2nd phase |
BG16RFOP001-1.002-0003-C04 |
4 567 575.40
|
4 567 294.78
|
Construction, complete renovation / reconstruction of 26 schools and kindergartens on the territory of Sofia Municipality |
BG16RFOP001-1.001-0001-C05 |
3 223 200.20
|
3 379 272.56
|
Strengthening the landslide LOV19.44327.02 - rap on a road to a Regional landfill for solid household waste - "Sinchets" Str. in the town of Lukovit |
BG16M1OP002-4.003-0002-C01 |
577 552.46
|
577 552.46
|
Reconstruction and improvement of urban areas in Dobrich |
BG16RFOP001-1.011-0006-C02 |
554 233.54
|
441 864.45
|
Restoration and conservation of habitats and species in Central Balkan National Park |
BG16M1OP002-3.007-0006-C07 |
0.00
|
0.00
|
Rehabilitation of a street network, equipment and accessories to their territory of Municipality of Kaspichan |
BG06RDNP001-7.001-0030-C03 |
539 615.26
|
532 530.66
|
Asphalting of streets with the construction of a circular intersection in the town of Suvorovo |
BG06RDNP001-7.001-0001-C01 |
704 820.30
|
800 766.48
|
Rehabilitation of Railway line Plovdiv – Burgas, Phase 2 - Stage 1 |
BG16M1OP001-1.001-0003-C05 |
0.00
|
0.00
|
"Building accessible infrastructure for the effective use, development and promotion of fisheries" |
BG14MFOP001-4.014-0001-C02 |
398 076.61
|
331 728.16
|
Construction of water supply and sewerage infrastructure on the designated territory served by "Water Supply and Sewerage" Ltd. - Stara Zagora |
BG16M1OP002-1.016-0013-C06 |
22 380 201.05
|
28 423 700.96
|
"Improving the Water Regime and Management of Succession Processes in Wetlands of International Importance
Ropotamo Complex, Poda protected site and Vaya Lake" |
BG16M1OP002-3.015-0004-C03 |
0.00
|
0.00
|
Construction of Water systems and Sewage infrastructure in the designated territory, served by "ViK-Varna" LTD |
BG16M1OP002-1.016-0009-C05 |
0.00
|
0.00
|
Construction of WSS infrastructure for designated territory, operated by WSS Ruse LTD |
BG16M1OP002-1.016-0001-C05 |
0.00
|
0.00
|
Prevention and counteraction of landslide processes on the Republican road network - Phase 2 |
BG16M1OP002-4.003-0010-C05 |
0.00
|
0.00
|
Construction of a farm and a fishery for the rearing of African catfish (Clarias gariepinus) in a recirculating system in UPI III-078040,078041, identical to PI 04426.78.48 in kv.088 in the village of Bliznatsi, municipality of Avren. |
BG14MFOP001-2.012-0004-C03 |
568 267.95
|
1 136 527.89
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-1297-C01 |
23 795.01
|
23 795.01
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-1429-C01 |
0.00
|
62 472.48
|
Supporting medium-sized enterprises to overcome the economic impact of the COVID-19 pandemic |
BG16RFOP002-2.077-0383-C01 |
0.00
|
4 558.33
|
" Investments in processing marketing of agricultural products " |
BG06RDNP001-4.001-0094-C02 |
323 677.08
|
716 963.66
|
Integrated Water Project for the District of Burgas |
BG16M1OP002-1.016-0011-C07 |
417 619.80
|
58 128.00
|
Rehabilitation and reconstruction of the street network in the municipality of Devnya - Devnya, Pomelyanovo, Saedinenie Blvd. The aim of the project is to restore and improve the transport performance of road pavements and sidewalks in order to ensure conditions for traffic safety, comfort of passengers and good drainage. |
BG06RDNP001-7.001-0065-C05 |
0.00
|
770 396.96
|
Recovering SMEs by improving energy efficiency |
BG16RFOP002-6.002-0975-C01 |
149 900.00
|
299 800.00
|
Construction of Water systems and Sewage infrastructure in the designated territory, served by "ViK-Varna" LTD - phase 2 |
BG16FFPR002-1.001-0001-C01 |
0.00
|
0.00
|